SourcingAI
Try for free
Powered by Made-in-China.com
Construction Machinery Parts: Engine Injector Assembly 04132014 for Deutz Tcd2.9 Engine
US$320.00-360.00
1 Piece

Product profile

Certification

CCC, COP, ISO9001, CE, E-Mark, RoHS, TS16949

Standard Component

Standard Component

Technics

Forging

Model NO.

04132014

Type

Mechanically Controlled Fuel Injector Assembly

New and Old

New

Original Parts Properties

Yes

Land for Sale

Nationwide

Color

as Shown in The Figure

Inventory Availability

Available Now

Mode of Transportation

Air/Sea/Express (FedEx, DHL, UPS)

Operating Temperature Range

-40°C to +135°C

Injection Pressure

22-24MPa

Spray Angle

155°

Atomized Particle Diameter

< 40μm

Body

High-Strength Alloy Steel

Needle Valve Assembly

Wear-Resistant Alloy Material

Transport Package

Carton or Wooden Box

Specification

04132014

Production Capacity

10000

Key features

Adjustable Pressure Design: Built-in high-pressure spring allows precise injection pressure adjustment for different operating conditions.
Dual Filtration Protection: Fine filter and inlet filter block impurities to protect needle valve and extend service life.
Integrated Structure: Integrates nozzle, body, and components for simplified maintenance and easy replacement.
High-Strength Alloy Body: Constructed from high-strength alloy steel for durability in harsh mining environments.
Wear-Resistant Needle Valve: Needle valve assembly made of wear-resistant alloy material for long-term performance.
Global 2-Year Warranty: Covers 2 years from delivery or 3,000 operating hours, whichever comes first.
24-Hour Technical Support: Professional team provides video and phone guidance for installation and troubleshooting.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.58hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like