SourcingAI
Try for free
Powered by Made-in-China.com
Mining Loader Parts for Deutz Bf4m2011 Engine Assembly and Diesel Engine
US$7,000.00-9,400.00
1 Piece

Product profile

Speed

High Speed

Cooling Cylinder

Water-Cooled

Fuel

Diesel

Model NO.

BF4M2011

Cylinder Arrangement Form

L

Number of Cylinders

4-Cylinder

New and Old

New

Installation

Standard Installation

Original Parts Attributes

Yes

Land for Sale

Nationwide

Inventory Availability

Available Now

Is It Customizable

No

Number of Cylinders/Arrangement

4 Cylinders, in-Line

Air Intake Method

Turbocharging + Air-to-Air Intercooling

Bore × Stroke

94 mm × 112 mm

Maximum Power

68 Kw (92 HP) @ 2800 Rpm

Cooling Method

Forced Water Cooling

Lubrication Method

Pressure Lubrication + Splash Lubrication

Injection System

Single Pump (in-Line Pump)

Emission Standards

Euro II / Us T2

Transport Package

Wooden Box Pallet

Specification

BF4M2011

Production Capacity

1000

Key features

High Power Output: Maximum power of 68 Kw (92 HP) at 2800 Rpm with abundant low-speed torque.
Fuel Efficiency: Specific fuel consumption as low as 216g/kWh for better operating costs.
Robust Construction: Integrated cylinder block and high-strength crankshaft for harsh conditions.
Low Noise Design: Optimized structure reduces vibration and noise for sensitive scenarios.
Emission Compliance: Meets Euro II and US T2 environmental standards.
Turbocharging System: Turbocharging with air-to-air intercooling for strong starting capabilities.
Easy Maintenance: Modular design allows for small maintenance space and low failure rate.
Genuine Parts Supply: Offers genuine original parts and high-quality aftermarket components.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.38hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
The company primarily supplies underground loaders and engine assemblies, as well as spare parts. It also provides aftermarket spare parts. Engine components include cylinder blocks, crankshafts, cylinder heads, four-piece sets (engine, transmission, and chassis), fuel systems, cooling systems, repair kits, oil filter maintenance, electrical systems, and sensors. The complete loader assembly includes hydraulic systems, chassis, transmissions, torque converters, rear differentials, control system

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like