SourcingAI
Try for free
Powered by Made-in-China.com
Mining Parts for Complete Deutz Tcd2013L04 2V Engine Assembly, Diesel Engine
US$8,000.00-10,000.00
1 Piece

Product profile

Warranty

According to The Warranty

Speed

Speed

Cooling Cylinder

Water-Cooled

Model NO.

TCD2013L04 2V

Fuel

Diesel

Number of Strokes

Four-Stroke

Cylinder Arrangement Form

L

Number of Cylinders

4-Cylinder

New and Old

New

Installation

Standard Installation

Original Parts Attributes

Yes

Land for Sale

Nationwide

Inventory Availability

Available Now

Engine

in-Line 4-Cylinder, Water-Cooled

Number of Cylinders/Arrangement

4-Cylinder in-Line

Bore × Stroke

108 mm × 130 mm

Rated Power

104 Kw (140 HP) @2200 Rpm

Maximum Torque

565 N·M @1600 Rpm

Rated Speed

2100-2300 Rpm

Idle Speed

900 Rpm

Emission Standards

EU Iiia / Us T3

Fuel System

Exclusive Common Rail

Transport Package

Wooden Box Pallet

Specification

TCD2013L04 2V

Production Capacity

1000

Key features

Low Fuel Consumption: Minimum fuel consumption rate of 218 g/kWh using exclusive common rail system.
Durable Wet Liner Design: Wet cylinder liner design extends oil change cycles and reduces maintenance costs.
Cold Start Performance: Excellent cold start capability suitable for extremely low temperature environments.
High Sulfur Fuel Adaptability: Operates stably even with high sulfur content fuel in complex global conditions.
Compact Installation: Compact body design fits original equipment locations with 3 power take-off options.
Global Warranty Coverage: 2-year global warranty or 3,000 hours of operation, whichever comes first.
Fast Delivery: Standard models ship within 15-30 days from Qingdao port.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤0.69hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like