SourcingAI
Try for free
Powered by Made-in-China.com
Mining Parts for Deutz Bf8m1015cp Diesel Engine Assembly
US$21,000.00-28,000.00
1 Piece

Product profile

Warranty

According to The Warranty

Speed

Speed

Cooling Cylinder

Water-Cooled

Model NO.

BF8M1015CP

Fuel

Diesel

Number of Strokes

Four-Stroke

Cylinder Arrangement Form

V

Number of Cylinders

8-Cylinder

New and Old

New

Installation

Standard Installation

Original Parts Attributes

Yes

Land for Sale

Nationwide

Inventory Availability

Available Now

Is It Customizable

No

Bore × Stroke

132 mm × 145 mm

Rated Power/Speed

440 Kw (590 HP)/2100 Rpm

Maximum Torque/Speed

2720 N·M/1300 Rpm

Fuel System

Mechanical in-Line Pump Injection

Cooling Method

Forced Water Cooling

Electrical System

24 V Electric Start

Transport Package

Wooden Box Pallet

Specification

BF8M1015CP

Production Capacity

1000

Key features

Robust Durability: Resists impurities and operates stably in harsh, dusty mining environments.
Excellent Fuel Economy: Optimized combustion system ensures lower fuel consumption than similar models.
Low Noise & Vibration: High-rigidity design and balance system ensure smooth, quiet operation.
Easy Maintenance: High parts versatility with shared components reduces lifecycle costs.
24/7 Technical Support: Professional team provides video/phone guidance and 24-hour response.
Comprehensive Warranty: Global 2-year warranty or 3,000 hours, whichever comes first.
Genuine Quality Parts: Supplies genuine original or high-quality aftermarket parts meeting standards.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.40hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Genuine Parts Engine Assembly 6uz1-Tc for Fvr/Fvz/Giga Truck
Made-in-China.com
Genuine Parts Engine Assembly 6wg1 for Fvr/Fvz/Giga Truck
Made-in-China.com