SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Equipment Parts for Deutz F8l413fw Diesel Engine Assembly
US$26,000.00-34,000.00
1 Piece

Product profile

Warranty

According to The Warranty

Certification

CE, ISO9001: 2000

Condition

New

Model NO.

F8L413FW

New and Old

New

Installation

Standard Installation

Original Parts Attributes

Yes

Land for Sale

Nationwide

Inventory Availability

Available Now

Is It Customizable

No

Engine Type

V-Type 8-Cylinder, Four-Stroke, Air-Cooled Diesel

Bore × Stroke

125 mm × 130 mm

Isplacement

12.763 L

Rated Power/Speed

136 Kw (182 HP)/2300 Rpm

Maximum Torque/Speed

665 N·M/1500 Rpm

Minimum Idle Speed

600 Rpm

Emission Standards

EU II/Us Tier 2

Transport Package

Wooden Box Pallet

Specification

F8L413FW

Production Capacity

1000

Key features

Air-Cooled Design: No water cooling system required, avoiding freeze cracks and leakage in extreme conditions.
High Torque at Low Speed: Maximum torque at 1500 rpm ensures fast response during heavy-load starting and climbing.
Compact Modular Structure: V-shaped layout with integrated cooling system allows for small installation space and easy maintenance.
Low Operating Cost: Excellent fuel consumption with long maintenance intervals and low oil consumption.
MSHA Safety Certification: Passed US MSHA coal mine safety certification for use in harsh underground scenarios.
Global Warranty Coverage: 2-year warranty from delivery or 3,000 hours of operation, whichever comes first.
Flexible Shipping Options: Available via air, land, sea, or express couriers like DHL, UPS, and FedEx.
Wide Application Scope: Suitable for excavators, loaders, underground scrapers, and tunnel construction projects.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.40hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like