Powered by Made-in-China.com
Mining Underground Loader Parts: 3 Cubic Meter Loader Boom 2.06.02.0058
US$5,000.00-5,800.00
1 Piece
Product profile
Warranty
According to The WarrantyCertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008Manufacturing Process
ForgingModel NO.
2.06.02.0058Place of Origin
ChinaNew and Old
NewOriginal Parts Properties
YesColor
as Shown in The FigureLand for Sale
NationwideInventory Availability
Available NowRated Adaptable Load
6 TonsBoom Type
Box StructureMaterial;
High-Strength Wear-Resistant Steel PlateThe Maximum Lifting Angle Is About
45°-50°Hydraulic Interface
Double-Acting Cylinder InterfaceMaximum Lifting Force
About 120-140kNOperating Temperature
-10℃ to +50℃Protection Level;
Anti-Corrosion and Wear-Resistant CoatingCompatible Hydraulic Pump
Variable Piston PumpTransport Package
Carton or Wooden BoxSpecification
2.06.02.0058Production Capacity
10000Key features
FEA Optimized Design: Box-shaped reinforced structure with built-in multi-stiffened plates for excellent torsion and bending resistance.
High-Strength Material: Made of high-strength wear-resistant steel plate, increasing service life by about 30%.
Anti-Corrosion Coating: Heavy anti-corrosion coating resistant to dust, moisture, and acid gas for extended underground service life.
Modular Maintenance: Standardized pin and cylinder interfaces facilitate rapid replacement and maintenance underground.
High Reliability: 100% non-destructive testing of key welds and self-lubricating bearings reduce failure rates.
Compact Structure: Low and compact design suitable for narrow underground spaces and tunnel passability.
Company profile
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.40hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB
About Our Factory & Business Background
AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.
Send Inquiry
*To:
Shandong Wolkang Machinery Equipment Co., Ltd.
Shandong Wolkang Machinery Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Excavator Parts 240-3cubic Meter -Hdr
Negotiable
1 Piece(MOQ)
7FT Symons Cone Crusher Spare Part Eccentric Bushing Three-Coordinate Detection Mining Machinery Part
US$5,000.00-12,000.00
1 Piece(MOQ)
Construction Machinery Hardware Spare Parts/Custom Mining Excavator Loader Dump Truck Spare Parts
US$500.00-1,000.00
1 Piece(MOQ)
Spare Parts for Underground Mining Machines Like Control Valve, Wiper,
US$10.00-5,000.00
1 Piece(MOQ)
Mantle Bowl Liner Mining Cone Crusher High Manganese Mining Machinery Parts
US$1.50-2.30
1 kg(MOQ)
Concrete Sprayer Spraymec Mf050 Spare Parts Replacement for Underground Mining
US$9.00-9,999.00
1 Set(MOQ)
3222 32751 3/3222327513/Heavy Duty Drilling Rigs/Mining Machinery Parts
US$1,000.00-200,000.00
1 Piece(MOQ)
Concave Bowl Liner Mining Quarrying Stone Crusher OEM Spare Parts High Quality
US$1.50-2.30
1 kg(MOQ)
Mining Equipment Boom Structure/Heavy Duty Drilling Rigs/Mining Machinery Parts
US$1,000.00-200,000.00
1 Piece(MOQ)
Robust Mining Equipment Parts with Long-Lasting Underground Connectors
US$1.00
1 Piece(MOQ)



















