SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Loader Parts: 3 Cubic Meter Loader Steering Cylinder Repair Kit 2.13.01.0009
US$35.00-55.00
1 Piece

Product profile

After-sales Service

According to The Warranty

Warranty

According to The Warranty

New and Old

New

Model NO.

2.13.01.0009

Whether It Is Standard Part

Standard Component

Connection Method

Standard Connections

Original Parts Properties

Yes

Land for Sale

Nationwide

Inventory Availability

Available Now

Mode of Transportation

Air/Sea/Express (FedEx, DHL, UPS)

Product Quality

High Quality

Applicable Models

3 Cubic Underground Scraper

Working Pressure

16-25 MPa

Working Temperature

-20℃~+120℃

Sealing Material1

Polyurethane (PU), Nitrile Rubber (NBR)

Sealing Material2

Fluorine Rubber (FKM)

Transport Package

Carton or Wooden Box

Specification

2.13.01.0009

Origin

China

Production Capacity

10000

Key features

Precise Original Adaptation: 1:1 match with original factory drawings, no modification required for installation.
High Performance Sealing: Polyurethane + NBR composite seals resist high pressure, oil, and wear to prevent leakage.
Durable Long Service Life: Seals tested for 1500-2000 hours under high temperature, pressure, and fatigue conditions.
Harsh Environment Resistance: Anti-aging and chemical corrosion resistant, withstanding moisture, dust, and temp fluctuations.
Easy Installation & Maintenance: Standard kit requires no additional processing, reducing maintenance costs and downtime.
Complete Repair Kit Design: Includes all seals and wearing parts for complete cylinder overhaul in one replacement.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.79hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like