SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Loader Parts: Dana 32000 Loader Gearbox 4 Speed Electro-Hydraulic Control Valve 251003
US$1,800.00-2,100.00
1 Piece

Product profile

Place of Origin

China

Productive Forces

Powerful

Adaptability

Powerful

Model NO.

251003

New and Old

New

Whether It Is Standard Part

Standard Component

Compatible Models

Dana 32000 Series All-Power Shift Gearbox

Type

Pilot-Operated Electro-Hydraulic Directional Valve

Power Supply

24V DC / 12V DC

Rated Current

Approx. 1.0-1.2A

Rated Working Pressure

16-18 MPa

Rated Flow Rate

100-120 L/Min

Working Medium

Transmission Hydraulic Oil

Operating Oil Temperature

-20℃ to +100℃

Structure

Integrated Valve Manifold / Cartridge Valve Core

Transport Package

Carton or Wooden Box

Specification

251003

Production Capacity

1000

Key features

Shock-Free Shifting: Precise electro-hydraulic co-control ensures smooth, jerky-free four-gear shifting for improved operator comfort.
High Reliability: High-strength steel body and hardened valve core resist wear, contamination, and harsh mining conditions.
Direct Replacement: Strictly matches Dana 32000 series interfaces and logic, directly replacing original part 251003.
Integrated Design: Compact integrated solenoid and hydraulic valves reduce pipeline connections and potential leakage points.
Safety Protection: Includes overpressure protection safety valve and automatic power loss reset to neutral position.
Intelligent Control: Compatible with transmission ECU for automatic shifting and optimized strategies based on load and speed.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.66hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like