SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Loader Parts: Dana 32000 Loader Gearbox Reverse and Third Gear Clutch Hub 251929
US$1,800.00-2,100.00
1 Piece

Product profile

Warranty

According to The Warranty

Certification

ISO/TS16949:2002, CE, RoHS, E-Mark

Usage

Heavy Duty Trucks, Car, Racing Cars, Farm Machinery

Model NO.

251929

Working Mode

Electricity Combination

Working State

Semi Linkage

Place of Origin

China

Productive Forces

Powerful

Adaptability

Powerful

New and Old

New

Whether It Is Standard Part

Standard Component

Connection Method

Standard Connections

Features

It Has Efficient Torque Transmission Capability to

Operating Pressure

Approximately 930-1000 Kpa

Material Standard

High-Strength Alloy Steel

Application Power Range

93-167 Kw

Maximum Input Speed

3100 Rpm

Turbine Stall Torque

1325 Nm

Operating Temperature Range

-40℃ to +120℃

Transport Package

Carton or Wooden Box

Specification

251929

Production Capacity

1000

Key features

High-Strength Alloy Steel: Made of high-strength alloy steel with carburizing and quenching treatment for superior wear resistance.
Effective Sealing Structure: Multiple sealing structures prevent hydraulic oil leakage in dusty and humid environments.
Modular Design: Allows complete disassembly and replacement, significantly reducing maintenance time and costs.
High Torque Transmission: Spiral bevel gears provide high torque transmission efficiency and reduce noise and vibration.
Original Factory Certified: Manufactured by Dana with rigorous bench and field testing to ensure reliability under extreme conditions.
High Input Speed Capacity: Maximum input speed reaches 3100 Rpm for high-performance applications.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.63hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Synchronizer Hub for Automotive

Synchronizer Hub for Automotive

US$5.00
10,000 Pieces(MOQ)
Made-in-China.com