Powered by Made-in-China.com
Mining Underground Loader Parts: Dana C270 Loader Torque Converter Output Shaft Gear 242560
US$190.00-220.00
1 Piece
Product profile
Warranty
According to The WarrantyManufacturing Process
ForgingMaterial
High-Strength Low-Carbon Alloy SteelModel NO.
242560New and Old
NewColor
as Shown in The FigureLand for Sale
NationwideInventory Availability
Available NowMode of Transportation
Air/Sea/Express (FedEx, DHL, UPS)Product Quality
High QualityGear Type
Spur Gear (External Gear)Tooth Surface Accuracy
ISO 6 (Precision Grinding)Gear Surface Treatment1
Carburizing and QuenchingGear Surface Treatment2
Low-Temperature TemperingMounting Reference Surface
Gear End Face + Shaft Shoulder PositioningOperating Speed
Maximum 2400 RpmLubrication Method
Forced Pressure LubricationFitting Method
Output Shaft Interference Fit + Keyway ConnectionTransport Package
Carton or Wooden BoxSpecification
242560Production Capacity
10000Key features
Original Quality & Precise Fit: No installation gaps, direct replacement without adjustment, avoids premature wear.
High Strength & Long Lifespan: Forged low-carbon alloy steel, HRC 58-62 hardness, lifespan up to 8000+ hours.
Smooth Transmission & Low Noise: ISO 6 accuracy, noise < 82 dB, transmission efficiency > 98%.
Impact Resistance & Reliability: Withstands heavy loads, IP65 sealing, suitable for dusty/humid underground environments.
Easy Maintenance & Cost Savings: 2000-hour maintenance cycle, shared lubrication systems, stable supply of parts.
High Precision Manufacturing: Carburizing, quenching, and precision grinding ensure optimal tooth surface accuracy.
Global Warranty Coverage: 2-year global warranty or 3,000 hours of operation, whichever comes first.
Flexible Shipping Options: Available via Air, Sea, Land, or Express (FedEx, DHL, UPS, TNT).
Company profile
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.52hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB
About Our Factory & Business Background
AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.
Send Inquiry
*To:
Shandong Wolkang Machinery Equipment Co., Ltd.
Shandong Wolkang Machinery Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Mining Underground Loader Parts: Dana 36000 Loader Gearbox Idler Shaft 250346
US$500.00-550.00
1 Piece(MOQ)
Mining Underground Loader Parts: Dana 270 Loader Torque Converter Turbine Shaft 214933
US$190.00-210.00
1 Piece(MOQ)
High Quality 2111386 Planetary Gear Shaft Machined Iron High Load Capacity for Underground Loader Transmission
US$357.1428-428.57
10 Pieces(MOQ)
Forge Parts ODM/OEM Custom Made Petroleum Mining Output Shaft/Input Eccentric Shafts
US$8,888.00
1 Piece(MOQ)
Mining Underground Loader Parts: Dana 36000 Loader Gearbox Input Shaft 249493
US$530.00-560.00
1 Piece(MOQ)
Underground Mining LHD Parts Dana 36000 LHD Transmission Output Shaft 231867
US$570.00-610.00
1 Piece(MOQ)
C120 Jaw Crusher Spare Parts Eccentric Shaft Ht-mm0514925 for Mining Machinery Industry
US$5,000.00
1 Piece(MOQ)
Machining Custom Mining Heavy Duty Forging Steel Wheel Spiral Pinion Gear Shaft
US$666.00-1,266.00
1 Piece(MOQ)
OEM Custom Mining Machinery Forged Steel Large Spline Pinion Gear Shaft
US$450.00-1,400.00
1 Piece(MOQ)
OEM Mining Sprocket Shaft Assembly for Underground Operations
US$6,000.00-9,000.00
1 Piece(MOQ)
Mining Machine Parts CH895 Mining Crusher Equipment Main Shaft
US$500.00
1 Piece(MOQ)
Mining Machine CH440 Cone Crusher Spare Part Main Shaft Ht-Bg00215620
US$2,500.00
1 Piece(MOQ)
Mining Machine CH430 Cone Crusher Spare Part Main Shaft Assembly Excluding Mantle
US$5,000.00
1 Piece(MOQ)
Customized Forging Abnormal Mining Machinery Parts Eccentric Shaft for Clinker Grate Cooler
US$999.00-9,999.00
1 Piece(MOQ)
Hyton C110 Jaw Crusher Spare Parts Eccentric Shaft Ht-287909 OEM Replacement for Ore Mining
US$2,000.00-4,000.00
1 Piece(MOQ)
3115082180/3115 0821 80/Motor Drive Shaft/Drilling Rig/Mining Machinery Parts
Negotiable
1 Piece(MOQ)



















