SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Loader Parts for Deutz Bf4l2011 Engine Assembly
US$7,000.00-9,400.00
1 tower

Product profile

Cold Style

Air-Cooled

Displacement

3.1L

Number of Cylinders

Four Cylinder

Model NO.

BF4L2011

Adaptability

Powerful

New and Old

New

Bore × Stroke

94mm×112mm

Intake Method

Turbocharged

Cooling Method

Air Cooling + Oil Cooling

Fuel System

Mechanical Direct Injection

Maximum Power

58.1kw (77.9HP) @2800rpm

Maximum Torque

230nm@1600rpm

Rated Speed

2800rpm

Minimum Idle Speed

900rpm

Emission Level

EU II/Us T2

Number of Cylinders/Arrangement

4 Cylinders, Inline

Transport Package

Wooden Box Pallet

Specification

BF4L2011

Production Capacity

1000

Key features

Compact and Lightweight Design: Small size and light weight save installation space, suitable for small loaders and excavators.
High Torque Output: Delivers 230Nm torque at 1600rpm for easy heavy load starting and climbing.
Durable Air-Oil Cooling: No water tanks or pumps reduces failure points in high-temperature and dusty conditions.
Low Maintenance Requirements: Key maintenance points are concentrated on one side for efficient daily inspection.
Fuel Efficient Operation: High-efficiency direct injection ensures low specific fuel consumption and cost savings.
Emission Compliance: Meets Euro II and US T2 emission standards for global market compliance.
Genuine Quality Parts: All parts are genuine original or high-quality aftermarket parts meeting industry standards.
24/7 Technical Support: Professional team provides model matching and installation guidance within 24 hours.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.62hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like