SourcingAI
Try for free
Powered by Made-in-China.com
Mining Underground Loader Parts: Loader Differential Gear Flange, Main Reduction Gear Flange 2.03.01.0051
US$4.00-8.00
1 Piece

Product profile

Certification

CE, RoHS, ISO 9001:2000, ISO 9001:2008

Manufacturing Process

Forging

New and Old

New

Model NO.

2.03.01.0051

Whether It Is Standard Part

Standard Component

Connection Method

Standard Connections

Color

as Shown in The Figure

Land for Sale

Nationwide

Inventory Availability

Available Now

Mode of Transportation

Air/Sea/Express (FedEx, DHL, UPS)

Product Quality

High Quality

Compatible Models

2 Cubic Meter Underground/Open-Pit Scraper

Structural Type

Integral Flange

Material

Medium Carbon Alloy Structural Steel

Heat Treatment

Quenching and Tempering +

Heat Treatment 2

High-Frequency Quenching of Spline/Journal

Working Torque

5,000-8,000 N·M

Working Temperature

-30℃ ~ +120℃

Transport Package

Carton or Wooden Box

Specification

2.03.01.0051

Production Capacity

10000

Key features

Precision Spline Transmission: Involute splines ensure accurate centering, high efficiency, and no loosening or noise.
Reliable Flange Connection: End face stop and bolt assembly prevent wobble, vibration, and oil leakage.
Certified Quality Standards: Certified with CE, RoHS, ISO 9001:2000, and ISO 9001:2008 standards.
Fast Global Shipping: Available for immediate shipment via Air, Sea, or Express (FedEx, DHL, UPS).
Low Maintenance Design: Simple press-fit installation and robust construction reduce maintenance needs.

Company profile

Shandong Wolkang Machinery Equipment Co., Ltd.
Fast DeliveryLow MOQImporters and ExportersIn-stock Capacity
Business Type: Trading CompanyExport Year: 2025-02-18Nearest Port: QINGDAOAverage Response Time: ≤1.63hTerms of Payment: LC, Western Union, T/T, etc.International Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressJinan, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMining Equipment, Underground Loader, Mining Trucks, Diesel Engine Part, Engine Assembly and Parts, for Deutz Engine Parts, for Volvo Engine Parts, for Cummins Engine Parts, Full Vehicle After-Sales Parts, Generator Set

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the delivery time for an order?
A:
Standard models ship within 15-30 days.
Q:Does this product support PayPal account payment?
A:
Of course, we accept multiple payment methods (such as L/C, T/T, D/P, etc.).
Q:What is the engine warranty period?
A:
Global warranty: 2 years from delivery or 3,000 hours of operation, whichever comes first.
Q:What is the minimum order quantity (MOQ)?
A:
For general parts, we don't have a minimum order quantity (MOQ) and can order 1 piece. However, for parts like bearings and pistons, we may have a minimum order quantity of 6 or 12 pieces. We will inform you if there is a minimum order quantity for special parts.
Q:What are your main products and their applications?
A:
Our core products include two-, four-, and six-cylinder engines, as well as diesel and gas generator sets. These engines are widely used in power generation equipment, industrial water pumps, agricultural machinery, construction machinery, marine engineering equipment, and offshore applications.

Send Inquiry

*To:Shandong Wolkang Machinery Equipment Co., Ltd.Shandong Wolkang Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

HP100 Mining Cone Crusher Drive Gear Pinion Spare Wear Parts
Made-in-China.com