Powered by Made-in-China.com
E-Commerce Fulfillment High Picking Efficiency Carton Flow Warehouse Racking
US$37.00
10-99 Pieces
US$33.00
100-499 Pieces
US$28.00
500+ Pieces
Sample price:US$37.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Spare Parts,Online Technical SupportWarranty
3 YearsModel NO.
OGL-CFS-003Usage
Industrial, Warehouse RackMaterial
SteelStructure
Lean-to Multi-Layer Frame Integrated DesignType
Carton Flow ShelvingMobility
CombinedHeight
0-5mWeight
150-500kgClosed
OpenDevelopment
ConventionalServiceability
Common UseInstallation
Bolt Assembled, No Welding on SiteSlide Incline
3°~5° Standard Gravity Tilt AngleSurface Finish
Epoxy Powder Coating Blue/Orange; Galvanized OptioApplicable Goods
Carton Box, Parts Box, Regular Packaged GoodsMatching Accessory
Stopper & Anti-Fall Baffle EquippedWarehouse Match
Work with Picking Warehouse Assembly LineColor
Blue,White,Orange,Gray,Yellow,CustomizedCertificates
ISO9001/14001/45001Design
CAD Drawing ProfessionalAdjustable Pitch
75mmTransport Package
Loaded on Steel Pallets, Wrapped with Bubble FilmSpecification
Q235B cold rolled steel; Standard size: customizedTrademark
ouglonOrigin
ChinaHS Code
7308900000Production Capacity
3000 Set/MouthKey features
FIFO gravity storage:Gravity roller sliding realizes first in first out, ideal for batch turnover inventory.
High picking efficiency:Front picking, rear replenishment, separate operation without cross interference, greatly save walking time.
Space optimization:High-density vertical layered storage, improve warehouse space utilization greatly.
Flexible adjustable structure:Layer height freely adjusted to fit different carton sizes; roller types optional per cargo weight.
Safe durable design:Built-in end stopper prevents cargo falling; thickened Q235 steel ensures long service life, low maintenance cost.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full CustomizationExport Year: 2014-06-09Nearest Port: Shanghai, Shenzhen, GuangzhouAverage Response Time: ≤4.15h
About Our Factory & Business Background
AddressXiaogan, Hubei, China
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)FOB, EXW, CIF, DDP, Others, FCA, CFR, DAT, FAS, DAP, CIP, CPT
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsPallet Rack, Storage Rack, Warehouse Rack, Heavy Duty Rack, Steel Shelving Rack, Cold Storage, Metal Shelving, Shuttle Racking, Drive in Rack, as/RS Warehouse Storage
Inspection Type for Finished Products100% inspection(Visual inspection)
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes
Product Q&A
Q:What steel do you use for carton flow rack?
A:
Standard Q235B cold forming steel, high hardness, anti-bending, stable bearing capacity. Frame surface sprayed with anti-rust epoxy paint.
Q:How to choose plastic roller or steel roller?
A:
Light cartons below 100kg choose plastic roller for cost saving; heavy box over 150kg uses galvanized steel roller for wear resistance.
Q:Is the roller slope fixed?
A:
Standard 3 to 5 degrees gravity slope for smooth sliding; we customize tilt angle according to your box weight and packaging hardness.
Q:Are your racks safe? How do you ensure they won't collapse? How is the load capacity calculated and tested?
A:
Safety is our top priority. All racks are made of high-strength steel (e.g., Q235B) and feature professional structural design. Load capacities are strictly calculated based on uniformly distributed static loads and validated through simulation testing. We provide clear safety load labels and recommend following our installation and loading guidelines to prevent overloading.
Q:What are the production lead time and shipping time?
A:
Production lead time is about 15-25 working days for standard items. Customization adds 5-10 days. Shipping time varies by destination port (e.g., 18-25 days to US West Coast, 28-35 days to European main ports). We provide a detailed production and logistics schedule.
Send Inquiry
*To:
Hubei Ougulong Intelligent Logistics Equipment Co., Ltd.
Hubei Ougulong Intelligent Logistics Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Efficiency Intelligent Shuttle Rack Tailored for E-Commerce Warehousing
US$0.70-1.15
1,000 kg(MOQ)
E-Commerce Warehouses Steel Racking Carton Flow Rack with Modular Design
US$0.89-1.00
1 kg(MOQ)
E-Commerce Picking Warehouse Carton Flow Rack
US$40.00-50.00
1 Set(MOQ)
OEM Carton Live Storage Flow Rack for E-Commerce Fulfillment Centers
US$0.89-1.00
1 Piece(MOQ)
Heavy Duty Carton Flow Rack for Order Picking High Density Warehouse Storage System
US$0.89-1.00
1 Piece(MOQ)
Selective Pallet Rack for E Commerce Fulfillment Warehouses Handling High Sku Inventory
US$0.60-1.13
5,000 kg(MOQ)
Pallet Flow Racking First-in-First-out for Multi-Sku E-Commerce Fulfillment Centers
US$0.90-1.00
10 kg(MOQ)
Inventory Picking Selective Pallet Rack for E Commerce Warehouse Fulfillment Operations
US$0.50-1.30
5,000 kg(MOQ)
Maximize Storage Density in Limited Space with Warehouse Rack for E-Commerce Fulfillment Center
US$98.00-158.00
10 Pieces(MOQ)
High-Frequency Order Fulfillment Narrow Aisle Rack for E-Commerce Logistics
US$26.90-35.90
2 Sets(MOQ)
Carton Flow Racking System for Warehouse Fifo Design for High-Efficiency Order Picking
US$30.00-38.00
10 Pieces(MOQ)



















