Powered by Made-in-China.com
Mold Rack with Full-Extension Drawers for Organized Mold Storage in Workshops
US$450.00
1-99 Sets
US$180.00
100+ Sets
Product profile
Customization
AvailableAfter-sales Service
Response Within 24h, Spare Parts SupplyWarranty
3 YearsModel NO.
OGL-MDR-001Usage
Tool Rack, Tools, Industrial, Warehouse RackMaterial
SteelStructure
RackType
Mold RacksMobility
AdjustableHeight
2-6mWeight
200kg-2000kgClosed
OpenDevelopment
ConventionalServiceability
for Special PurposeLayer
2 Layers/3 Layers/CustomizableColor
Blue,White,Orange,Gray,Yellow,CustomizedApplication
Any Area Where Goods Need to Be StoredCustomized
Other Special Size( You Can Contact Us Directly)Certification
CE/ISO/SGSTransport Package
Loaded on Steel Pallets, Wrapped with Bubble FilmSpecification
Q235B cold rolled steel; Standard size: customizedTrademark
ouglonOrigin
ChinaHS Code
7308900000Production Capacity
5000tons/MonthKey features
Thickened steel columns ensure stable overall structure and strong impact resistance
Drawer-type layered design for clear mold classification and easy access
Built-in anti-fall device prevents drawer slippage during pulling for enhanced safety
Vertical storage maximizes floor space, boosting utilization by over 50%
100% pull-out drawers with overhead hoist eliminate manual lifting, reducing labor intensity
Heavy-duty roller guides ensure smooth drawer operation without jamming after long-term use
Optional safety railings and anti-tipping devices comply with workshop safety standards
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full CustomizationExport Year: 2014-06-09Nearest Port: Shanghai, Shenzhen, GuangzhouAverage Response Time: ≤3.14h
About Our Factory & Business Background
AddressXiaogan, Hubei, China
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)FOB, EXW, CIF, DDP, Others, FCA, CFR, DAT, FAS, DAP, CIP, CPT
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsPallet Rack, Storage Racks, Warehouse Rack, Heavy Duty Rack, Steel Shelving Rack, Cold Storage, Metal Shelving, Shuttle Racking, Drive in Rack, as/RS Warehouse Storage
Inspection Type for Finished Products100% inspection(Visual inspection)
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes
Product Q&A
Q:How much loading capacity per square meter for standard floor?
A:
Standard uniform load ranges from 300kg to 800kg per square meter, customizable.
Q:Can you design rack layout according to my warehouse size and pallet dimension?
A:
Yes, free warehouse layout design & CAD drawing available, we adjust rack depth, height, bay width to fit your warehouse and pallets perfectly.
Q:How long is production lead time? How do you pack products to prevent damage during sea shipping?
A:
Regular order lead time is 7~15 working days; packed with steel pallet + bubble film + stretch film. We provide after-sales technical support and spare parts supply.
Q:Are your racks safe? How do you ensure they won't collapse? How is the load capacity calculated and tested?
A:
Safety is our top priority. All racks are made of high-strength steel (e.g., Q235B) and feature professional structural design. Load capacities are strictly calculated based on uniformly distributed static loads and validated through simulation testing. We provide clear safety load labels and recommend following our installation and loading guidelines to prevent overloading.
Q:What are the production lead time and shipping time?
A:
Production lead time is about 15-25 working days for standard items. Customization adds 5-10 days. Shipping time varies by destination port (e.g., 18-25 days to US West Coast, 28-35 days to European main ports). We provide a detailed production and logistics schedule.
Send Inquiry
*To:
Hubei Ougulong Intelligent Logistics Equipment Co., Ltd.
Hubei Ougulong Intelligent Logistics Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Small Grid Drawer Rack for Mold Making Workshop Small Tool Storage
US$170.00-180.00
5 Pieces(MOQ)
1-2t Heavy Duty Steel Mold Drawer Rollout Rack for Injection Die Storage Workshop
US$300.00
1 Piece(MOQ)
Mold Rack with Heavy-Duty Drawers for Safe Injection Mold Storage
US$180.00-450.00
1 Set(MOQ)
Glass Rack with Drawer Storage Glass Rack for Glass Storage Manual Electrical Rack System
US$100.00-21,700.00
1 Set(MOQ)
Multi-Tier Mold Rack for Organized and Efficient Mold Workshop Storage
US$180.00-450.00
1 Set(MOQ)
1000kg Heavy Duty Steel Mold Rack with Drawer for Warehouse Mould Storage
US$250.00-680.00
1 Piece(MOQ)
Heavy Duty Mold Stacking Rack with Drawer Crown Block for Warehouse Storage
US$250.00-680.00
1 Piece(MOQ)
Type Heavy Mold Pallet Rack with Hydraulic Assisted Pull out Device Steel Storage Rack for Warehouse Rack Metal Rack
US$60.00-380.00
10 Pieces(MOQ)
Industrial Drive in Rack with Shelving for Heavy Pallet Loads and Deep Lane Storage
US$60.00-380.00
10 Sets(MOQ)



















