Powered by Made-in-China.com
Mining Ore Ball Mill for Iron Gold Copper Ore Beneficiation
US$5,299.00
1 Piece
US$4,999.00
2+ Pieces
Product profile
Customization
AvailableType
Ball MillMotor Type
AC MotorModel NO.
CustomizedMotor Power
15KWRotationl Speed
23-25r/minApplication
MineMaterials
MiningCondition
NewWarranty
3 YearsAfter-sales Service
EngineersEnergy Saving
Energy SavingColor
Multi ColorMachinery Test Report
ProvidedCapacity
1-300t/HProduct Name
Ball MillApplicaton
Gold Mining, Cement Making, QuarrySpare Parts
SupplyOperating Training
ProvidedVideo Outgoing-Inspection
ProvidedTransport Package
Disassembled TransportSpecification
900*1800-5500*8500Trademark
PengpaiOrigin
ShandongHS Code
8474202000Production Capacity
100000square Meter/YearKey features
Energy Saving Design: 30% lower energy consumption than industry averages, cutting annual electricity costs by up to $8,000 per unit.
High-Chromium Wear Parts: Service life of 8,000 hours, twice that of ordinary materials, minimizing replacement frequency and costs.
3-Year Warranty Coverage: Comprehensive 3-year warranty for all mechanical equipment with free parts and labor for defects.
Flexible Customization: Tailored solutions for capacity, color, dimensions, and ore types to match specific production requirements.
24/7 Technical Support: Engineers available via video call with on-site maintenance service within 72 hours for key regions.
High Grinding Efficiency: 95% particle size qualification rate eliminates secondary grinding and shortens production cycles by 25%.
ISO and CE Certified: Certified by ISO 9001 and CE, meeting international quality, safety, and environmental protection standards.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.57h
AI-Powered supplier vetting
SummaryThe supplier operates in mining machinery and related mechanical, metal, plastic, rubber, and biobased-material activities. It identifies as a professional technical supplier, provides OEM/ODM and multiple customization options, and reports two production lines, 11–20 quality-control staff, inventory capability, standardized finished-product inspection instructions, and peak/off-season lead times within 15 working days. However, it does not provide 3D software design, has no available SDK, reported no new products in the past year, and has no supplier-management-system certification. Export activity is reported at 51%–70% of sales, but exporting began one year ago. Financial information for the stated periods records zero operating revenue and zero listed profit or cost figures. There is no valid manufacturing-capacity contract with related subcontractors, no overseas warehouse, overseas showroom, overseas agent or branch, or offline trade-show participation. The supplier states that it provides OEM...
Supplier typeThe supplier explicitly identifies as a professional technical supplier and lists manufacturing and sales of mining machinery among its business activities, together with related mechanical, metal, plastic, rubber, and biobased-material operations. This supports classification as a technical manufacturing supplier rather than a service-only provider.
CertificationsThe supplier-management-system certification field is recorded as NIL. Although the company describes having a complete quality management system, no formal certification is evidenced in the provided information.
After-Sales capabilityThe supplier reports inventory capability and accepts multiple quotation and payment terms, with average lead times within 15 working days in both peak and off-season periods. However, it has no overseas warehouse, showroom, overseas agent or branch, and offers overseas services in zero countries, so international after-sales coverage is limited.
Financial creditThe financial records provided for 2024 and the prior two-year period show zero operating revenue, while the stated 2024 operating cost, gross profit, and operating profit are also zero. These figures provide no positive evidence of operating financial strength and represent a material credibility concern, although the context does not explain whether the records are incomplete or reflect actual operations.
R&D capabilityThe supplier reports professional technical R&D capability and one year of total R&D-engineer experience, but no available SDK and no new products in the past year. It does provide ODM services, yet the evidence indicates limited demonstrated recent innovation.
Production capacityThe supplier reports two production lines, 11–20 quality-control staff, inventory capability, documented and uniformly followed finished-product inspection instructions, and lead times within 15 working days. These are positive operational indicators, but the absence of a valid manufacturing-capacity contract with related subcontractors creates a production-governance risk.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, and also provides ODM and OEM services for well-known brands. It does not provide 3D software design services, but the stated physical/product customization scope is broad.
Product Q&A
Q:What is the difference between grid type and overflow type ball mill?
A:
Grid type ball mill is equipped with a grid plate at the discharge end, which has high grinding efficiency and is suitable for coarse grinding (fineness 0.15-0.4mm), widely used in ore beneficiation pre-grinding; overflow type ball mill relies on overflow to discharge materials, with finer grinding fineness (0.074-0.15mm), suitable for fine grinding of cement clinker and chemical raw materials.
Q:What is the warranty period for the ball mill?
A:
We provide a comprehensive 3-year warranty for all our mechanical equipment, covering mechanical defects with free parts and labor.
Q:How long does it take to receive spare parts?
A:
Regular parts are delivered within 7-15 days, while customized parts require 20-30 days for production and delivery.
Q:What is the maximum daily output capacity?
A:
The processing capacity ranges from 0.8 to 25 T/H, with a maximum daily output of 600 tons to meet large-scale production needs.
Q:Is on-site installation and training provided?
A:
Yes, our professional technical team provides overseas on-site installation, commissioning, and operator training including equipment operation, maintenance, and steel ball replacement skills.
Send Inquiry
*To:
Shandong Pengpai Mining and Industry Accessories Co., LTD
Shandong Pengpai Mining and Industry Accessories Co., LTD*Content:
Supplier replies will be sent to your registered email
You may also like
High-Efficiency Wet Ball Mill Manufacturer for Mineral Grinding, Used as Grinding Machine for Processing Gold, Copper, Zinc, Iron, etc.
US$100,000.00-108,000.00
1 Set(MOQ)
Large Capacity 3 Rollers 0-2 mm Wet Pan Mill for Gold Mining
US$2,400.00
1 Piece(MOQ)
Grinding Wet Gold Copper Cement Ore High Efficiency Mining Industrial Ball Mill
US$14,800.00-15,000.00
1 Piece(MOQ)
Factory Price Ball Mill for Grinding Fine Powder in Gold Ore Processing Plant
US$6,800.00
1 set(MOQ)
Large Capacity Grinding Dry Raw Cement Coal Marble Dolomite Clinker Ball Mill Machine for Stone Ore Mining
US$200,000.00-250,000.00
1 Set(MOQ)
Hot Sale Mining Machinery Grinding Mill Ball Mill for Ore
US$6,500.00
1 set(MOQ)
Mining Machinery Iron Ore, Copper Ore, Limestone, Concrete Grinding Ball Mill
US$17,000.00-17,200.00
2 Sets(MOQ)
5-50tph Good Quality Rod Mill Machine for Mining Industry, Ore Rod Mill Machine
US$6,800.00
1 set(MOQ)
China Ball Mill 2 Ton /Hours Diesel Ball Mill 900X1800 Price for Gold Ore Processing Plant in Sudan
US$4,850.00-9,800.00
1 Set(MOQ)
Nile Machinery High Efficiency Mining Equipment Ore Wet Grinding Ball Mill
US$4,600.00-5,000.00
1 Piece(MOQ)
Mining Ball Mill for Grinding Gold, Copper, Iron, Tin, Manganese, Lead and Aluminum Ores Mining Equipment
US$10,000.00-500,000.00
1 Set(MOQ)
Large Capacity Grinding Ore Ceramic Cement Mining Wet/Dry Gold Industrial Ball Mill
US$17,500.00-18,000.00
1 Piece(MOQ)
Heavy-Duty Mining Grinding High Capacity Dry Cone Ball Mill for Gold CIP Copper Silver Zinc Ore Processing with Manganese Liner
US$5,700.00-570,000.00
1 set(MOQ)
Low Price Gold Mine Wet Pan Mill Machine 1-3 Tons Per Hour Wet Round Roller Mill with Motor and Bearing for Gold Copper Ore
US$2,000.00-2,500.00
1 Piece(MOQ)
Multi-Function Mineral Stone Grinding Machine/Cement Lime Powder Making Mill/Gold Ore Mining Dry Ball Mill
US$80,000.00-500,000.00
1 Piece(MOQ)



















