Powered by Made-in-China.com
Building Material Scaffolding Forged Coupler with Good Quality
US$1.58
2,000-4,999 Pieces
US$1.57
5,000-24,999 Pieces
US$1.56
25,000+ Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableMaterial
MetalType
FastenersModel NO.
WJ-C12Name
Building Material Scaffolding Forged Coupler withScaffolding Coupler Weight
1.2kgScaffolding Coupler Size
48.3*48.3, 48.3*76mm, 48.3*89mmUsage
Fixed Scaffolding PipeScaffolding Coupler Surface Treatment
Electro Galvanized, HDGScaffolding Coupler Certification
SGS, Sigma, En74, ISOScaffolding Coupler MOQ
2000PCSPackage
Steel Pallet, Wooden PallteBusiness Tupe
Manufacturer, ExportService
OEM ServiceAdvantage
Good Quality with Competitive PricePayment Termes
T/T, L/C, D/a;Western UnionDelivery Time
15days for 10000PCSNote
Produce by Customer DrawingProduce History
More Than Ten YearsApplication
Decorations, ConstructionsCertification
ISO, SGSSurface Treatment
YesTechnics
ForgedAfter-sales Service
24hoursWarranty
5yearsTransport Package
PalletsSpecification
48.3*48.3mm, 48.3*60mm, 48.3*76mmTrademark
weijieOrigin
Rizhao, ShandongHS Code
73084000Production Capacity
300000PCS/YearCompany profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-03-09 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.74h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
Address100 Meters East of The Intersection of Fuzhou Road and Shantou Road, Rizhao, Shandong, China
Plant Area11989 square meters
Number of Employees118
Registered Capital50,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsScaffold, Scaffolding, Constructon Formwork, Forged Auto Parts
Production MachinesForging Line, Drilling Machine, Punching Machine, CNC Milling Machine, Wire Cutting Machine, Electric Molding Machine, Shot Blasting Machine, Welding Robot, Grinding Machine
R&D Engineers4 people
Our Industry Experience & Global Business Record
Year of Establishment2017-09-25
Main MarketsEurope
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
Send Inquiry
*To:
Shandong Pinzheng Metal Products Co., Ltd.
Shandong Pinzheng Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Building Material Q235 Steel Double Coupler Scaffolding Clamp and Scaffold Clip Drop Forged Swivel Coupler
US$0.05-0.10
10,000 Pieces(MOQ)
Building Material Scaffolding British Type Forged Coupler
US$1.24-1.26
2,000 Pieces(MOQ)
Pressed Putlog Building Material Clamp Forged Wrapover Scaffolding Fastener Scaffold Coupler
US$0.90-0.93
2,000 Pieces(MOQ)
Building Material Fastening Clamp Fastener Scaffolding Beam Retaining Girder Coupler
US$2.06-2.13
1,000 Pieces(MOQ)
En 74 BS1139 Pressed Scaffold Fixed Scaffolding Forged Swivel Pipe Tube Coupler Building Material
US$0.75-2.00
1,000 Pieces(MOQ)
Building Material Fastening Clamp Scaffolding Parts Galvanzied Forged Board Retaining Coupler
US$0.90-0.93
2,000 Pieces(MOQ)
Scaffolding Coupler Construction Building Material Forged Sleeve Coupler
US$1.00-3.00
5,000 Pieces(MOQ)
Building Material Q235 Steel Double Coupler Scaffolding Clamp and Scaffold Clip Drop Forged Swivel Coupler
US$0.80-0.99
1,000 Pieces(MOQ)
Hot Sale Scaffolding 48*76 German Type Swivel Coupler for Building Material
US$2.70-2.90
2,000 Pieces(MOQ)
Building Material Zinc Plated European Forged Double Clamp Scaffolding Coupler
US$1.74-1.80
1,000 Pieces(MOQ)
Construction Building Material Pressed/Forged Fixed Forged Swivel Pipe Scaffolding Coupler
US$1.50-6.50
20 Tons(MOQ)
Construction Building Materials German Drop Forged Double Swivel Scaffolding Coupler
US$0.75-2.00
1,000 Pieces(MOQ)
Scaffolding Pressed Sleeve Coupler for Building Material
US$1.00-1.20
2,000 Pieces(MOQ)
Construction Building Material Metal Swivel Clamp Scaffolding Pressed/Forged Coupler
US$1.50-6.50
20 Tons(MOQ)
Building Material Scaffolding Joint Cast Iron Scaffolding Coupler for Construction Hardware
US$0.50-2.00
50 Pieces(MOQ)
Draped Swivel Scaffold/Double Scaffolding Coupler Cover for Building Material Construction
US$1.25-1.53
1,000 Pieces(MOQ)



















