Powered by Made-in-China.com
China Supply Galvanized Scaffolding Single Coupler Putlog Coupler for Construction BS1139 En74
US$1.00
2,000-4,999 Pieces
US$0.90
5,000-19,999 Pieces
US$0.80
20,000+ Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
5yearsModel NO.
PZ-C09Material
MetalType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldName
Forged Putlog CouplerWeight
0.65kgAsmaterial
Q235 SteelCertificate
SGS, Sigma, ISO9001Advantage
Competitive Price, Good QualityMOQ
1500PCSLogo
as Your RequestModel No.
Pz-C09Surface Treatment
Electro Galvanized, HDGTransport Package
PalletsSpecification
48.3mmTrademark
PezonOrigin
Rizhao, ShandongProduction Capacity
300000PCS/YearKey features
SGS & ISO9001 Certified: Products certified by SGS, Sigma, and ISO9001 for quality assurance.
Competitive Pricing: Offers good quality forged couplers at competitive market prices.
Factory Direct Supply: Directly manufactured by a specialized factory with 118 employees.
Flexible Customization: Supports custom logo and specific model requirements upon request.
Durable Material: Made from Q235 steel with electro-galvanized or hot-dip galvanized finish.
Fast Production Cycle: Standard production time is 15-30 days after order confirmation.
Free Samples Available: Free samples provided, with customer covering shipping costs.
5-Year Warranty: Comprehensive 5-year warranty with online technical support.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-03-09 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.48h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
Address100 Meters East of The Intersection of Fuzhou Road and Shantou Road, Rizhao, Shandong, China
Plant Area11989 square meters
Number of Employees118
Registered Capital50,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsScaffold, Scaffolding, Constructon Formwork, Forged Auto Parts
Production MachinesForging Line, Drilling Machine, Punching Machine, CNC Milling Machine, Wire Cutting Machine, Electric Molding Machine, Shot Blasting Machine, Welding Robot, Grinding Machine
R&D Engineers4 people
Our Industry Experience & Global Business Record
Year of Establishment2017-09-25
Main MarketsEurope
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
Product Q&A
Q:Are you a factory or trading company?
A:
We are a factory specializing in manufacturing all kinds of scaffolding material.
Q:Where is the loading port?
A:
Qingdao port
Q:What's the MOQ of the product?
A:
Different item has different MOQ. Normally 1500pcs is preferred.
Q:What certificates do you have?
A:
We have ISO 9001,SGS,SIGMA certification.
Q:Can I get some samples?
A:
Yes, Sample is free, but usually the customer will pay for the shipping cost.
Send Inquiry
*To:
Shandong Pinzheng Metal Products Co., Ltd.
Shandong Pinzheng Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
En74 Standard Forged Steel Scaffolding Coupler for Construction
US$0.65-2.80
1,000 Pieces(MOQ)
Premium Drop Forged Scaffolding Swivel Coupler for Construction
US$0.90
10,000 Pieces(MOQ)
British Drop Forged/Pressed Steel Pipe Scaffolding Putlog Clamp Single Coupler
US$1.00-3.00
500 Pieces(MOQ)
Efficient Forged Scaffolding Clamp Scaffold Coupler BS1139 for Quick Installations.
US$0.52
3,000 Pieces(MOQ)
BS1139 Standard Drop Forged Double Putlog Coupler for Metal Tubular Scaffolding UK
US$1.10-3.00
500 Pieces(MOQ)
Drop Forged Scaffolding Coupler for En74 BS1139 Construction Use
US$0.86-1.00
500 Pieces(MOQ)
High-Quality Forged Scaffolding Clamp Scaffold Coupler BS1139 for Construction Sites.
US$0.52
3,000 Pieces(MOQ)
Putlog Coupler Scaffolding Clamp for Traditional Tube and Fitting Scaffolding Structures
US$660.00-670.00
5 Tons(MOQ)
Easy Scaffold BS1139 Drop Forged Pressed Galvanized Coupler for Scaffolding Fixing
US$1.99
500 Pieces(MOQ)
Construction Hardware Galvanized Scaffolding Half Coupler/Putlog Coupler for Scaffolding Tube
US$0.002-0.009
5,000 Pieces(MOQ)
Forged Single Putlog Coupler for Construction
US$2.10-2.20
2,000 Pieces(MOQ)
China Supplier BS Type Hot DIP Galvanized Half Coupler for Building Work
US$6.10-6.40
1,000 Pieces(MOQ)
BS1139/En74 Certified Scaffold & Scaffolding Coupler for Construction & Building Material
US$0.90-6.00
100 Pieces(MOQ)
Heavy-Duty Scaffolding Coupler Clamp for Reliable Construction Support
US$0.59-0.79
500 Pieces(MOQ)
Adjustable Forged Scaffolding Clamp Scaffold Coupler BS1139 for Flexible Use.
US$0.52
3,000 Pieces(MOQ)
Scaffolding Tubes BS1139 Galvanized Steel Pipe Scaffolding Manufacturers in China Putlog Coupler Scaffolding
US$1.38-1.90
5,000 Pieces(MOQ)
Easy Scaffolding BS1139 Galvanized British Drop Forged 48.3mm Half/Single Couplers Putlog Coupler
US$0.85-1.58
100 Pieces(MOQ)



















