Powered by Made-in-China.com
China Supply Galvanized Scaffolding Single Coupler Putlog Coupler for Construction BS1139 En74
US$1.00
2,000-4,999 Pieces
US$0.90
5,000-19,999 Pieces
US$0.80
20,000+ Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
5yearsModel NO.
PZ-C09Material
MetalType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldName
Forged Putlog CouplerWeight
0.65kgAsmaterial
Q235 SteelCertificate
SGS, Sigma, ISO9001Advantage
Competitive Price, Good QualityMOQ
1500PCSLogo
as Your RequestModel No.
Pz-C09Surface Treatment
Electro Galvanized, HDGTransport Package
PalletsSpecification
48.3mmTrademark
PezonOrigin
Rizhao, ShandongProduction Capacity
300000PCS/YearKey features
SGS & ISO9001 Certified: Products certified by SGS, Sigma, and ISO9001 for quality assurance.
Competitive Pricing: Offers good quality forged couplers at competitive market prices.
Factory Direct Supply: Directly manufactured by a specialized factory with 118 employees.
Flexible Customization: Supports custom logo and specific model requirements upon request.
Durable Material: Made from Q235 steel with electro-galvanized or hot-dip galvanized finish.
Fast Production Cycle: Standard production time is 15-30 days after order confirmation.
Free Samples Available: Free samples provided, with customer covering shipping costs.
5-Year Warranty: Comprehensive 5-year warranty with online technical support.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-03-09 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.33h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
Address100 Meters East of The Intersection of Fuzhou Road and Shantou Road, Rizhao, Shandong, China
Plant Area11989 square meters
Number of Employees118
Registered Capital50,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsScaffold, Scaffolding, Constructon Formwork, Forged Auto Parts
Production MachinesForging Line, Drilling Machine, Punching Machine, CNC Milling Machine, Wire Cutting Machine, Electric Molding Machine, Shot Blasting Machine, Welding Robot, Grinding Machine
R&D Engineers4 people
Our Industry Experience & Global Business Record
Year of Establishment2017-09-25
Main MarketsEurope
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
Product Q&A
Q:Are you a factory or trading company?
A:
We are a factory specializing in manufacturing all kinds of scaffolding material.
Q:Where is the loading port?
A:
Qingdao port
Q:What's the MOQ of the product?
A:
Different item has different MOQ. Normally 1500pcs is preferred.
Q:What certificates do you have?
A:
We have ISO 9001,SGS,SIGMA certification.
Q:Can I get some samples?
A:
Yes, Sample is free, but usually the customer will pay for the shipping cost.
Send Inquiry
*To:
Shandong Pinzheng Metal Products Co., Ltd.
Shandong Pinzheng Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Factory Price Scaffolding Clamp Beam Coupler BS Type Girder Coupler for Construction
US$0.60-0.90
1,000 Pieces(MOQ)
Premium Drop Forged Scaffolding Swivel Coupler for Construction
US$0.90
10,000 Pieces(MOQ)
Shlomi EN74-1 BS1139 Drop Forged Scaffolding Single Half Coupler
US$0.50-2.00
1,000 Pieces(MOQ)
China Supplier Building Scaffolding Putlog Coupler for Construction
US$1.00
10 Pieces(MOQ)
Premium En74 & BS1139 British Drop Forged Scaffolding Coupler for Easy Setup
US$0.0425
3,000 Pieces(MOQ)
BS1139 Scaffolding Swivel Couplers Putlog Single Couplers
US$2.38-2.65
1,000 Pieces(MOQ)
BS1139 En74 Construction Tube Fixed Clamp Pipe Fittings Forged Double Swivel Board Putlog Coupler Scaffolding
US$1.17-1.47
1,000 Pieces(MOQ)
Heavy-Duty Scaffolding Beam Coupler for Safe Construction Projects
US$650.00
1,000 Tons(MOQ)
British Type Hot DIP Galvanized Forged Scaffolding Single Coupler /Clamp for Pipe Connection
US$0.0003-0.0009
10,000 Pieces(MOQ)
High-Quality Forged Scaffolding Clamp Scaffold Coupler BS1139 for Construction Sites.
US$0.52
3,000 Pieces(MOQ)
Premium Sleeve Couplers for Scaffolding - Top Quality From China
US$0.994
2,750 Pieces(MOQ)
Robust Forged Scaffolding Clamp Scaffold Coupler BS1139 for Long-Lasting Durability.
US$0.52
3,000 Pieces(MOQ)
Premium Europe Standard Scaffolding Coupler Clamp for Construction
US$0.80-0.90
500 Pieces(MOQ)
Drop Forged Steel 360 Degree Clamp/Swivel Coupler for European Construction Scaffolding
US$2.02-2.08
1,500 Pieces(MOQ)
Reliable Forged Scaffolding Clamp Scaffold Coupler BS1139 for Secure Structures.
US$0.52
3,000 Pieces(MOQ)
Heavy-Duty Galvanized Scaffolding Couplers for Steel Pipe Construction
US$1.082
2,750 Pieces(MOQ)
Italian Type Single Putlog Coupler Scaffolding Clamp for Construction Pipe Connection
US$0.56-1.34
2,000 Pieces(MOQ)



















