Powered by Made-in-China.com
Scaffolding Accessories Clamp Forged Panel Clamp for Building Material
US$6.00
2,000-4,999 Pieces
US$5.90
5,000-7,799 Pieces
US$5.80
7,800+ Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
24hoursWarranty
5yearsModel NO.
WJ-FC05Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
High FormworkErection Position
Internal ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PlanksConstruction Properties
Building ScaffoldName
Scaffolding accessories Clamp Forged Panel ClampScaffolding Coupler Weight
3.2kgScaffolding Coupler Size
80X60X20mmScaffolding Coupler Surface Treatment
Electro Galvanized, HDGScaffolding Coupler Certification
SGS, Sigma, En74, ISOScaffolding Clamp MOQ
2000PCSPackage
Steel Pallet, Wooden PallteBusiness Tupe
Manufacturer, ExportService
OEM ServiceAdvantage
Good Quality with Competitive PricePayment Termes
T/T, L/C, D/a;Western UnionDelivery Time
15days for 10000PCSNote
Produce by Customer DrawingProduce History
More Than Ten YearsWeight
3.2kgTransport Package
PalletsSpecification
80X60X20mmTrademark
weijieOrigin
Rizhao, ShandongHS Code
73084000Production Capacity
300000PCS/YearKey features
OEM/ODM Customization: Supports OEM service and production by customer drawings with special marks.
High-Quality Materials: Made from Q235 or #45 steel with forged process for durability.
Multiple Surface Treatments: Available in electro galvanized and hot dip galvanized (HDG) finishes.
Wide Compatibility: Supports German, American, Italian, British, and Australian type coupler sizes.
Competitive Pricing: Offers high quality with competitive prices from a professional manufacturer.
Certified Quality: Products certified by SGS, Sigma, En74, and ISO9001 standards.
Fast Delivery: Delivery time is 10-15 days after order confirmation.
Professional Service: 24-hour after-sales service and professional technical support.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-03-09 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.53h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
Address100 Meters East of The Intersection of Fuzhou Road and Shantou Road, Rizhao, Shandong, China
Plant Area11989 square meters
Number of Employees118
Registered Capital50,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsScaffold, Scaffolding, Constructon Formwork, Forged Auto Parts
Production MachinesForging Line, Drilling Machine, Punching Machine, CNC Milling Machine, Wire Cutting Machine, Electric Molding Machine, Shot Blasting Machine, Welding Robot, Grinding Machine
R&D Engineers4 people
Our Industry Experience & Global Business Record
Year of Establishment2017-09-25
Main MarketsEurope
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
Product Q&A
Q:What is the MOQ for this product?
A:
The Minimum Order Quantity (MOQ) is 2000 PCS.
Q:What materials are used for the clamp?
A:
The main material is Q235 steel, and some variants use #45 steel.
Q:Can I customize the product with my own design?
A:
Yes, we provide OEM service and can produce according to customer drawings.
Q:What surface treatments are available?
A:
We offer electro galvanized and hot dip galvanized (HDG) surface treatments.
Q:What is the delivery time?
A:
The delivery time is typically 10-15 days after order confirmation.
Send Inquiry
*To:
Shandong Pinzheng Metal Products Co., Ltd.
Shandong Pinzheng Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Construction Site Building Scaffolding 48mm Pipe Clamp Clip for Fence PVC Panel
US$0.30-0.33
5,000 Pieces(MOQ)
Scaffolding British Drop Forged Double Coupler / Scaffolding Clamp/Scaffolding Accessories
US$1.20-2.10
1,000 Pieces(MOQ)
Galvanizing Steel Beam Net Clamp with Bolt for Scaffolding in Concrete
US$19.00-35.00
1 Piece(MOQ)
BS1139 En74 Q235 Drop Forged Scaffolding Fixed Coupler Clamp for Building Materials
US$0.50-1.50
1 Piece(MOQ)
Wholesale Factory Supplier Construction Formwork Clamps for Construction
US$0.55-0.62
100 Pieces(MOQ)
Durable Drop Forged Clamp for BS1139/En74 Building Projects
US$0.90
10,000 Pieces(MOQ)
Drop Forged En74-1 Class B Scaffold Tube Fitting Scaffolding Clamp for Engineering
US$0.40-3.00
1 Piece(MOQ)
Easy Building Material Pressed 48.6mm JIS Type Swivel Clamp for Singapore
US$1.10-10.50
2,000 Pieces(MOQ)
Factory Swivel Coupler and Double Coupler Scaffolding Clamps for Scaffolding Construction Material
US$1.20-2.10
1,000 Pieces(MOQ)
Building Material Scaffolding Parts Fix and Swivel Clamps for Scaffolds
US$1.20-2.10
1,000 Pieces(MOQ)
Hot Dipped Galvanized Pressed Forged Type Steel Ladder Clamp for Scaffolding
US$0.69-0.80
100 Pieces(MOQ)
Forged Double Joint Fasteners for Scaffolding Pipe Galvanized Scaffold Clamp
US$1.00-1.50
5,000 Pieces(MOQ)
BS1139 Scaffolding Tubes Fittings Materials Parts Cross Swivel Clamp for Scaffolding Tubular
US$1.20-2.10
1,000 Pieces(MOQ)
Super Load Girder Coupler Forged Carbon Steel Dust Free Workshop Scaffolding Accessories Clamp
US$0.445
50,000 Pieces(MOQ)
Formwork Scaffolding Steel Forged Panel Clamp for High Quality Construction Doka Panel Clamp
US$2.99
2,000 Pieces(MOQ)



















