SourcingAI
Try for free
Powered by Made-in-China.com
Powder Coating Line CE Certified for Car Oven for Powder Coating
US$88,800.00
1 Piece
US$88,860.00
2-4 Pieces
US$88,680.00
5+ Pieces

Product profile

Application

Aerospace Industry, Automotive Industry, Construction Industry, Electronics Industry, Furniture Industry

Coating Type

E-Coating

Heating system

Diesel, electric, gas, LPG

Model NO.

Stsndard

Warranty

1 Year

Substrate Type

Galvanized/Aluminum-Zinc/Zinc-Aluminum-Magnesium,

Process Speed(M/Min)

20-120

Substrate Thickness(mm)

0.3-1.5/0.1-1.2

Substrate Width(mm)

700-1650

Energy Medium

Water/ Electricity/ Gas

Production Line Length (M)

100-200/70-200

Transport Package

Customized

Specification

20-250m/min

Trademark

Oncycle(QingDao)

Origin

China

Key features

Multi-Industry Application: Suitable for aerospace, automotive, construction, electronics, and furniture industries.
Flexible Heating Options: Supports diesel, electric, gas, and LPG heating systems for diverse energy needs.
Customizable Specifications: Adjustable process speed (20-120 m/min), substrate thickness, and line length.
High Production Capacity: Capable of handling 30,000 to 300,000 tons with a production capacity of 20 sets/year.
International Certifications: CE, ISO, and SGS certified ensuring compliance with global safety and quality standards.
Versatile Operation Modes: Offers automatic, semi-automatic, and manual operation modes for flexible control.
Wide Substrate Compatibility: Processes galvanized, aluminum-zinc, zinc-aluminum-magnesium, and stainless steel.
Comprehensive Process Flow: Includes uncoiling, washing, chemical treatment, coating, baking, and quality inspection.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2025-08-01Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: >24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CIF

About Our Factory & Business Background

AddressRoom 502, Building 22, No. 187, Zhengyang Road, Qingdao, Shandong, China
Plant Area500 square meters
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months

Our Production Capability & Technical Expertise

Main ProductsPowder Coating Line, Roofing Sheet Form Machine, Hot DIP Galvanized/Galvalume Line, Powder Coating, Steel Coil/Sheet

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What certifications does the powder coating line have?
A:
The equipment is certified with CE, ISO, and SGS standards.
Q:What are the available heating methods?
A:
The system supports diesel, electric, gas, and LPG heating methods.
Q:What is the warranty period for this equipment?
A:
We provide a 1-year warranty for the powder coating line.
Q:What substrates can this production line process?
A:
It processes galvanized, aluminum-zinc, zinc-aluminum-magnesium, and stainless steel.
Q:What is the typical delivery time?
A:
The delivery term is generally 3-5 months.

Send Inquiry

*To:Oncycle(Qingdao)New Material Technology Co., Ltd.Oncycle(Qingdao)New Material Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Xingyue Electrostatic Powder Coating Line for Car Parts
Made-in-China.com