SourcingAI
Try for free
Powered by Made-in-China.com
Injection Molding Water Air Purifier for Plastic Mold
US$80.00
100-999 Pieces
US$60.00
1,000+ Pieces
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

Warranty

3 Years

Shaping Mode

Injection Mould

Surface Finish Process

Polishing

Mould Cavity

Multi Cavity

Plastic Material

ABS

Process Combination Type

Single-Process Mode

Application

Household Appliances, Electronic, Home Use

Runner

Hot Runner

Design Software

UG

Certification

TS16949, CE, ISO

Standard

HASCO

Customized

Customized

After-sales Service

3 Years

Transport Package

Wood or Customized

Specification

380x300x20mm

Trademark

PSM

Origin

China

HS Code

3901100001

Production Capacity

600000000set/Years

Key features

Customized Service: Supports OEM and ODM services with customized mold designs.
High-Quality Steel: Constructed with S136H steel for durability and precision.
Hot Runner System: Equipped with one hot tip mold master for efficient injection.
Complex Structure: Features 4 sliders and hydraulic core puller for intricate designs.
Certified Quality: Holds TS16949, CE, and ISO certifications for reliability.
Fast Lead Time: Standard lead time of 35 working days for mold production.
Versatile Application: Suitable for household appliances, electronics, and home use.
Long Warranty: Provides a 3-year warranty and after-sales service coverage.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2009-05-04 CertifiedNearest Port: Shenzhen Port, Shanghai PortAverage Response Time: ≤10.28h CertifiedTerms of Payment: LC, T/T, PayPal, etc.

About Our Factory & Business Background

AddressNO.63 GAO KE AVENUE NAN YUE COMMUNITY BAO LONG STREET LONG GANG DISTRICT SHEN ZHEN CITY 518116,CHINA
Plant Area9000 square meters
Number of Employees60
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW, DAP
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsPlastic Molding Product
Production MachinesInjection Molding Machine, Milling Machine, EDM Machine, CNC Machine, Grinding Machine, Mixing Machine, Automatic Packing Machine, Computer Pipe Cutting Machine, Two-dimensional Measuring Instrument
R&D Engineers10 people

Our Industry Experience & Global Business Record

Year of Establishment2016-09-30
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia
Number of Foreign Trading Staff6
Overseas Agent/BranchNo

Product Q&A

Q:What is the warranty period for the mold?
A:
The product comes with a 3-year warranty and comprehensive after-sales service.
Q:Can the mold be customized?
A:
Yes, we offer customized services including OEM and ODM options for various mold sizes and structures.
Q:What is the lead time for production?
A:
The standard lead time is 35 working days. During peak and off-peak seasons, it is within 15 working days.
Q:What materials and certifications are used?
A:
The mold uses S136H steel and is certified with TS16949, CE, and ISO standards.
Q:What is the payment method?
A:
We accept LC, T/T, PayPal, and Western Union for payment terms.

Send Inquiry

*To:POWERFULSKY MOULD CO., LTD.POWERFULSKY MOULD CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Premium Customizable Water Purifier Shell for Home Use
Made-in-China.com
Customized Air Purifiers for Home and Office Spaces
Made-in-China.com
Custom Size Filter HEPA Filter Air Purifier
Made-in-China.com
Plastic Injection Mould for Automotive Fan Mould Fans Covers
Made-in-China.com
Rongdu Mould Light Household Office Table Chair Molds
Made-in-China.com