Address100 Meters North of The Oil Depot, 104 National Road, Botou City, Cangzhou, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsLight Gauage Steel Roll Forming Machine, Roof Sheet Forming Machine, Slitting Line, Sandwich Panel Production Line, Bending and Cutting Machine, Floor Deck Roll Forming Machine, Roler Shutter Door Roll Forming Machine
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What materials can this slitting line process?
A:
It accommodates various materials including cold rolled plates, electrolytic galvanized plates, hot dip galvanized plates, color-coated plates, stainless steel, aluminum, and copper.
Q:What is the maximum coil weight capacity?
A:
The hydraulic decoiler and recoiler have a capacity of 10 tons.
Q:How long is the warranty period?
A:
We provide a 1-year warranty for this equipment.
Q:What is the average lead time for production?
A:
Lead time is within 15 workdays during off-peak season and one month during peak season.
Q:What payment terms are accepted?
A:
We accept LC and T/T payment methods.
Send Inquiry
*To:Cangzhou Zunsheng Import and Export Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email