SourcingAI
Try for free
Powered by Made-in-China.com
5 Gallon Barrel Water Washing Filling Capping Machine with Water Purification System
US$5,800.00-13,800.00
1 Set

Product profile

Customization

Available

After-sales Service

Online and Offline Services

Warranty

1 Year

Model NO.

QGF-300

Type

Weighing-type Filling Machine

Automatic Grade

Automatic

Material Type

Liquid

Filling Valve Head

Single-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Capacity Cup

Filling Principle

Pressure

Packaging Container Lifting Structure

Pneumatic Lifting

Structure

Linear

Packaging

Bottle

Packaging Material

Plastic

After-Sales Service Provided

Engineers Available to Service Machinery Overseas

Product Name

Drinking Water Filling Machine

Material

Stainless Steel 304

Function

Washing Filling Capping

Processing Types

Pressure

Bottle Type

Pet Plastic Bottle

Usage

Beverage Packaging

Control

PLC+ Touch Screen

Capacity

150-300bph

Transport Package

Wooden

Specification

2750*2180*2400mm

Trademark

Proman

Origin

China

HS Code

8422301090

Production Capacity

200sets/Year

Key features

High Production Efficiency: Capacity ranges from 100 to 900 bottles per hour depending on the model.
Premium Electrical Components: Main electrical parts are from SIEMENS and OMRON for stable performance.
Durable Stainless Steel Construction: Made of high-quality Stainless Steel 304 with corrosion resistance.
Comprehensive After-Sales Support: Engineers available for overseas service, installation, and staff training.
Free Spare Parts Inclusion: One year supply of easy-wear spare parts sent free with the machine.
1-Year Warranty Coverage: Covers mechanical defects for one year from the date of purchase.
PLC and Touch Screen Control: Advanced automation with PLC and touch screen for easy operation.
Turnkey Solution Provider: Over 10 years of experience in beverage filling and packaging machinery.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.94hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

AI-Powered supplier vetting

SummaryZhangjiagang Proman Machine Co., Ltd., a limited company based in Jiangsu, China, specializes in machinery and equipment manufacturing, with a strong export focus (90% of sales). Their production includes filling and molding machines. The company lacks in-stock service and overseas warehousing capabilities. Despite participation in international trade shows and holding OEM contracts with known brands, there is no evidence of R&D with SDK availability. They also lack structured after-sales and quality assurance processes.
Supplier typeThe supplier operates as both a trading company and a manufacturer/factory, indicating a dual business model.
After-Sales capabilityThe supplier lacks written procedures for handling customer complaints and quality assurance processes, indicating weak after-sales service capability.
Financial creditThe supplier has financial capacity data available for the years 2021 to 2023, indicating some level of financial transparency.
R&D capabilityThe supplier provides OEM services to popular brands but lacks R&D capability with SDK availability.
Production capacityThe supplier specializes in manufacturing various types of machines like filling and molding machines, suggesting strong production capabilities.
Customization capabilityThe supplier offers flexible customization options ranging from minor to full customization.

Product Q&A

Q:Which city are you in and how can I get to your factory?
A:
We are located in Zhangjiagang city, which is two hours driving from Shanghai. We are a factory, not a trading company.
Q:Why is your price higher than others?
A:
We offer high-end machines. We welcome you to visit our factory to see the difference in quality and construction.
Q:What is your delivery time?
A:
Normally 30-60 working days depending on the machine type. Water machines are faster, while carbonated drink machines are slower.
Q:How to install my machines when it arrives and how much does it cost?
A:
We send engineers to your factory for installation and training. You are responsible for air tickets, accommodation, and our engineer wage of USD100/day/person.
Q:How long does the installation take?
A:
It depends on the machine and your factory conditions. If everything is ready, it takes about 10 to 25 days.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Automatic 5 Gallon 3 Gallon 5L Bottle Water Filling Machine
Made-in-China.com