SourcingAI
Try for free
Powered by Made-in-China.com
600bph 3-5 Gallon Barrel Water Bottle Filling Production Line
US$5,800.00-13,800.00
1 Set

Product profile

Customization

Available

After-sales Service

Online and Offline Services

Warranty

1 Year

Model NO.

QGF 600

Type

Weighing-type Filling Machine

Automatic Grade

Automatic

Material Type

Liquid

Filling Valve Head

Single-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Capacity Cup

Filling Principle

Pressure

Packaging Container Lifting Structure

Pneumatic Lifting

Structure

Linear

Packaging

Bottle

Packaging Material

Plastic

After-Sales Service Provided

Engineers Available to Service Machinery Overseas

Product Name

Drinking Water Filling Machine

Material

Stainless Steel 304

Function

Washing Filling Capping

Processing Types

Pressure

Bottle Type

Pet Plastic Bottle

Usage

Beverage Packaging

Control

PLC+ Touch Screen

Capacity

150-300bph

Transport Package

Wooden

Specification

2750*2180*2400mm

Trademark

Proman

Origin

China

Production Capacity

200sets/Year

Key features

High Automation: PLC+ Touch Screen control for fully automatic operation and high production efficiency.
Premium Components: Main electrical components use SIEMENS and OMRON for stable performance.
Durable Material: Constructed with high-quality Stainless Steel 304 for corrosion resistance and easy cleaning.
Versatile Application: Suitable for mineral water, pure water, and beverage packaging in 3-5 gallon barrels.
Compact Design: Linear structure with small footprint, integrating machine, electricity, and gas.
Free Spare Parts: Includes one year supply of easy-to-break spare parts free with the machine.
Overseas Support: Engineers available to service machinery overseas for installation and training.
Customizable Options: Customized product name, material, function, processing type, bottle type, usage, and control.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤2.89hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a trading company or factory?
A:
We are a factory located in Zhangjiagang city, two hours driving from Shanghai. We mainly manufacture beverage filling and packaging machines and offer turnkey solutions with more than 10 years experience.
Q:Why are your prices higher than others?
A:
We offer high-end machines in our business. You are welcome to visit our factory to see the difference.
Q:What is your delivery time?
A:
Normally 30-60 working days depending on the machines. Water machines are faster, while carbonated drink machines are slower.
Q:How to install my machines when it arrives? How much the cost?
A:
We will send our engineers to your factory to install the machines and train your staff how to operate the machines if needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q:How long time for installation?
A:
Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

5 Gallon Barring Mineral Water Filling Production Line
Made-in-China.com
3-5 Gallon Mineral/Pure Water Filling Line

3-5 Gallon Mineral/Pure Water Filling Line

US$9,000.00-30,000.00
1 Set(MOQ)
Made-in-China.com
Automatic 5 Gallon Table Water Filling Production Line
Made-in-China.com
Water Filling Gallon Drum Production Line

Water Filling Gallon Drum Production Line

US$30,000.00-40,000.00
1 Set(MOQ)
Made-in-China.com
5 Gallon Water Production Line

5 Gallon Water Production Line

US$3,000.00-50,000.00
1 Piece(MOQ)
Made-in-China.com