SourcingAI
Try for free
Powered by Made-in-China.com
Automatic 55mm Standard Neck 18L 20L Water Bucket Plastic Bottle Lid Injection Molding Machine
US$18,000.00-35,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

Two Years

Warranty

Two Years

Type

Preform Injection

Structure

Vertical and Horizontal Composite

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Hydraulic & Mechanical

Automation

Automatic

Computerized

Computerized

Certification

CE, ISO9001:2008, QS

Certificate

CE, ISO, SGS

Composition

Injection Molding Machine

Processing Material

PP,PE,PA,ABS

Elctric

Siemens, Mitsubishi, etc

Exchange Parts

Free

Capacity

100tons-1000tons

Application

Making Plastic Product

Transport Package

Wooden Case

Specification

3.2m*1.8m*2.4m

Trademark

Proman

Origin

China

HS Code

8422301090

Production Capacity

200machines/Year

Key features

Energy Saving Servo Motor: Saves 20%-80% electricity compared to traditional machines with closed-loop control.
High Precision Injection: Uses double linear guides and servo drive for faster response and higher repeatability.
Fast Cycle Time: Optimized design increases injection quantity by 40% and reduces cycle time significantly.
Low Noise Operation: Runs quietly at low speed with constant oil temperature control for environmental friendliness.
Versatile Material Processing: Compatible with PP, PE, PA, ABS, PET, UPVC, PVC, and various engineering plastics.
Easy Mold Changing: Equipped with T-groove structure on mold plate for quick and efficient mold replacement.
Two-Year Warranty: Comprehensive coverage for mechanical defects with free parts and labor for two years.
Global Certification: Certified with CE, ISO9001:2008, and SGS for international quality and safety standards.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.21hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for the machine?
A:
We provide a comprehensive 2-year warranty covering all mechanical defects with free parts and labor.
Q:How much electricity can the servo motor save?
A:
The servo energy-saving system can reduce electricity consumption by 20% to 80% compared to traditional machines.
Q:What types of plastic materials can this machine process?
A:
It processes thermoplastics including PP, PE, PA, ABS, PET, UPVC, and PVC for various applications.
Q:Does the machine offer after-sales support?
A:
Yes, we provide installation, debugging, technology training, and lifetime technical support with spare parts at favorable prices.
Q:What is the lead time for production?
A:
Lead time is one month during off-peak season and 1-3 months during peak season.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like