Powered by Made-in-China.com
Automatic Energy Drinks Canning CSD Filling Machine for Beverage Factory
US$12,500.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
ProvidedWarranty
12 Months After Running in Customer's FactoryModel NO.
GDF12-1Type
Volumetric Filling MachineAutomatic Grade
Fully AutomaticMaterial Type
LiquidFilling Valve Head
Multi-HeadFeed Cylinder Structure
Multi-Room FeedingDosing Device
Capacity CupFilling Principle
Atmospheric PressurePackaging Container Lifting Structure
Chute Pneumatic Combination LiftingStructure
RotaryPackaging
CanPackaging Material
PlasticFunction
Filling & SeamingMaterial of Structure
SUS304/316Capacity(500ml)
1000-12000bph Beverage Filling MachineCan Type
Pop Can / Aluminum Can / Tin CanMarket
Global Bottle Can Filling MachineProcessing Material
Water, Juice, Carbonated Drink, etcElctric
Siemens, Mitsubishi, etc Water Filling MachineCertificate
CE, ISO, SGSTransport Package
Export Standard Wooden CasesSpecification
4000*2300*2300mmTrademark
PromanOrigin
Jiangsu ChinaHS Code
8422301090Production Capacity
350sets/YearKey features
Customizable Structure Material: Structure material can be customized to SUS304 or SUS316 stainless steel.
Adjustable Filling Capacity: Capacity is customizable from 1000 to 12000 bph for 500ml cans.
Versatile Beverage Compatibility: Suitable for water, juice, carbonated drinks, and more via valve changes.
Comprehensive After-Sales Support: Includes 1-year warranty, lifetime technical support, and overseas installation.
High Production Efficiency: Fully automatic rotary design with stable working and high output.
Multi-Head Filling System: Features multi-head filling valves and multi-room feeding structure.
Global Certification Standards: Certified with CE, ISO, and SGS for international market compliance.
Complete Solution Provider: Offers full line from depalletizer to carton packaging systems.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.06hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
About Our Factory & Business Background
AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is your factory located?
A:
Our Factory is located in Zhangjiagang City, 2 hours drive from Shanghai and 1 hour drive from Wuxi(airplane & high-speed rail). If you arrive at Shanghai or Wuxi, we can pick you up to visit our factory.
Q:Do you provide technical support for your Beverage Filling Machines?
A:
Yes, We have a professional team of engineers who owned many installation, debug and training experiences abroad, are available to service machinery overseas.
Q:What is the warranty period and guarantee for quality?
A:
We offer high quality machines with 1 year warranty and supply life-long technical support. You're always welcome to visit our company. If you have any interest on our products. Please do not hesitate to contact us.
Q:Can the machine handle non-carbonated drinks?
A:
Yes, if you also want to use the same machine to fill non-carbonated drinks is available. Through change the isobaric pressure filling valves to normal pressure filling valves then it will be suitable for filling non-carbonated beverages such as energy drink , cold brew coffee, herbal tea and so on.
Q:What is the lead time for production?
A:
Peak Season Lead Time: 1-3 months. Off Season Lead Time: one month.
Send Inquiry
*To:
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Aluminum Pet Can Energy Juice Carbonated Beverage Canning Filling Sealing Machine (GDF24-6)
US$70,000.00
1 Piece(MOQ)
Can Filling Machine Sealing Package Machine for Carbonated Juice Beer Beverage Drinks
US$15,000.00-180,000.00
1 set(MOQ)
Fully Automatic Filling Machine for Mineral Water Purified Water Soda Beverage Juice
US$13,000.00
1 Piece(MOQ)



















