SourcingAI
Try for free
Powered by Made-in-China.com
Energy Efficient Automatic Glass Bottle Carbonated Drinks Soda Water Bottling Filling Machine
US$13,500.00
1 Piece

Product profile

Customization

Available

After-sales Service

Provided

Warranty

12 Months After Running in Customer's Factory

Type

Count Filling Machine

Automatic Grade

Fully Automatic

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Multi-Room Feeding

Filling Principle

Atmospheric Pressure

Packaging Container Lifting Structure

Chute Pneumatic Combination Lifting

Structure

Rotary

Packaging

Glass Bottle

Packaging Material

Plastic

Function

Washing & Filling & Capping

Material of Structure

SUS304/316

Capacity(500ml)

1000-12000bph Beverage Filling Machine

Bottle Type

Glass Bottle

Processing Material

Water, Juice, Carbonated Drink, etc

Elctric

Siemens, Mitsubishi, etc Water Filling Machine

Certificate

CE, ISO, SGS

Transport Package

Export Standard Wooden Cases

Specification

4000*2300*2300mm

Trademark

Proman

Origin

Jiangsu China

HS Code

8422301090

Production Capacity

350sets/Year

Key features

Fully Automatic Operation: Fully automatic grade ensures efficient and consistent production with minimal manual intervention.
Customizable Configuration: Customized based on capacity, liquid type, bottle shape, and capping requirements for specific needs.
Hygienic Design: External filling valves hang outside the tank, preventing material contact and reducing bacteria infection risk.
High Capacity Options: Available capacities range from 2000 to 15000 bottles per hour (500ml) depending on the model selected.
Comprehensive After-Sales: Includes 1-year warranty, lifetime technical support, and overseas engineer installation and training.
Multi-Head Filling: Multi-head filling valve structure with atmospheric pressure principle for stable and reliable filling.
Complete Line Solution: Offers integrated solutions including washing, filling, capping, pasteurization, cooling, and packaging.
Quality Control: Dedicated quality control department ensures qualified raw materials and smooth machine operation.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is your factory located?
A:
Our factory is located in Zhangjiagang City, 2 hours drive from Shanghai and 1 hour drive from Wuxi. We can pick you up if you arrive at Shanghai or Wuxi.
Q:Do you provide technical support for your machines?
A:
Yes, we have a professional team of engineers with extensive experience in installation, debugging, and training abroad, available to service machinery overseas.
Q:What is the warranty period for your machines?
A:
We offer a 1-year warranty for quality guarantee and provide life-long technical support for all our machines.
Q:Can the machine be customized for different products?
A:
Yes, the machine is customized based on production capacity, filling liquid, bottle types, caps, and material requirements to suit specific needs.
Q:What is the average lead time for production?
A:
The lead time is 1-3 months during peak season and one month during the off-season.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like