SourcingAI
Try for free
Powered by Made-in-China.com
Energy Saving 48 64 Cavity Preform Mold Detergent Water Juice Bottle Preform Injection Molding Machine
US$28,000.00-35,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

Two Years

Warranty

Two Years

Type

Preform Injection

Structure

Vertical and Horizontal Composite

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Hydraulic & Mechanical

Automation

Automatic

Computerized

Computerized

Certification

CE, ISO9001:2008, QS

Certificate

CE, ISO, SGS

Composition

Injection Molding Machine

Processing Material

PP,PE,PA,ABS

Elctric

Siemens, Mitsubishi, etc

Exchange Parts

Free

Capacity

100tons-1000tons

Application

Making Plastic Product

Transport Package

Wooden Case

Specification

3.2m*1.8m*2.4m

Trademark

Proman

Origin

China

HS Code

8422301090

Production Capacity

200machines/Year

Key features

Energy Saving Servo Motor: Saves 20%-80% electricity with closed-loop control and zero consumption during cooling.
High Precision Injection: Double linear guides and fast response servo drive increase repeatability precision by 50%.
Fast Cycle Time: Ceramic heating rings and optimized ejector design enable faster injection and plasticizing.
Low Noise Operation: Runs quietly at low speed with constant oil temperature control for environmental friendliness.
Versatile Application: Suitable for PET preforms, bottle preforms, automotive parts, and various thermoplastic materials.
Two Years Warranty: Comprehensive coverage including free wearing parts and quality guarantee for 12 months.
CE and ISO Certified: Meets international standards with CE, ISO9001:2008, and QS certifications.
Professional Installation: Experienced technicians provide on-site installation, debugging, and technology training.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.61hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for the machine?
A:
We offer a 12-month quality guarantee with free wearing parts, followed by a two-year warranty period.
Q:How much electricity can this machine save?
A:
The servo motor system saves 20% to 80% electricity compared to traditional machines, with zero consumption during cooling.
Q:What materials can be processed by this injection molding machine?
A:
It processes thermoplastics including PP, PE, PA, ABS, and is specifically designed for PET preforms and various plastic parts.
Q:Do you provide after-sales service and installation?
A:
Yes, we send experienced technicians for installation and debugging, and provide technology training and ongoing support.
Q:What are the lead times for production?
A:
The lead time is one month during off-peak season and 1-3 months during peak season.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like