SourcingAI
Try for free
Powered by Made-in-China.com
Full Automatic Servo Saving Energy Plastic Pet Preform Water Bottle Container Cap Handle Making Injection Molding Machine
US$18,000.00-35,000.00
1 Set
Sample price:US$0.01/piece.Request sample

Product profile

Customization

Available

After-sales Service

Provided

Warranty

One Year Warranty

Model NO.

PET-1650

Type

Injection Blow Molding

Structure

Horizontal

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Mechanical

Automation

Automatic

Computerized

Computerized

Certification

CE, ISO9001:2008, QS

Product Name

Injection Molding Machine

Function

Pet Preform Injection Molding

Used for

PP PE Pet Plastic Preform Cap

Motor Type

Servo Motor 15kw

Voltage

380V/50Hz

Capacity

90-1000 Ton

Feature

Efficient and Cheap

Quality

High Quality Guaranteed

Core Parts Warranty

2 Years Warranty

Machine Color

Blue and White

Market

Global Injection Molding Machine

Transport Package

Export Standard Wooden Cases

Specification

3000*1800*2000mm

Trademark

Proman

Origin

Jiangsu China

Production Capacity

300sets/Year

Key features

Servo Energy Saving: Equipped with servo motor for efficient and cheap operation with low energy consumption.
Low Fuselage Design: No height limit for workshop placement, convenient for feeding and maintenance.
High Precision Molding: Thermal flow system ensures high precision for bottle mouth, bottleneck, and screw.
Automatic Operation: Automatic dropping and molding without needing a manipulator; easy collection via conveyor.
Versatile Application: Injects various plastic parts including preforms, pipes, fittings, and automotive components.
CE and ISO Certified: Machine holds CE, ISO9001:2008, and QS certifications for quality assurance.
Global After-Sales Support: Engineers available for installation, training, and 24-hour response with 5-day part delivery.
Customizable Design: Machines can be designed according to specific material, power, and bottle type requirements.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.61hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is your factory located?
A:
Our Factory is located in Zhangjiagang City, 2 hours drive from Shanghai and 1 hour drive from Wuxi(airplane & high-speed rail). If you arrive at Shanghai or Wuxi, we can pick you up to visit our factory.
Q:Do you provide technical support for the machines?
A:
Yes, We have a professional team of engineers who owned many installation, debug and training experiences abroad, are available to service machinery overseas.
Q:What is the warranty period for the quality?
A:
We offer high quality machines with 1 year warranty and supply life-long technical support. You're always welcome to visit our company. If you have any interest on our products. Please do not hesitate to contact us.
Q:Can the machine be customized for specific needs?
A:
We can design the machines according your requirements(material,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q:What is the lead time for production?
A:
Peak Season Lead Time: 1-3 months. Off Season Lead Time: one month.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Servo Energy-Saving Injection Molding Machine

Servo Energy-Saving Injection Molding Machine

US$40,000.00-82,000.00
1 Set(MOQ)
Made-in-China.com