SourcingAI
Try for free
Powered by Made-in-China.com
Linear Type 2000cph CSD Carbonated Drink Can Filling Machine for Small Business
US$11,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

Provided

Warranty

12 Months After Running in Customer's Factory

Type

Volumetric Filling Machine

Automatic Grade

Fully Automatic

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Multi-Room Feeding

Filling Principle

Atmospheric Pressure

Packaging Container Lifting Structure

Chute Pneumatic Combination Lifting

Structure

Rotary

Packaging

Can

Packaging Material

Plastic

Function

Filling & Seaming

Material of Structure

SUS304/316

Capacity(500ml)

2000bph Beverage Filling Machine

Can Type

Pop Can / Aluminum Can / Tin Can

Market

Global Can Filling Machine

Processing Material

Water, Juice, Carbonated Drink, etc

Elctric

Siemens, Mitsubishi, etc Water Filling Machine

Certificate

CE, ISO, SGS

Transport Package

Export Standard Wooden Cases

Specification

4000*2300*2300mm

Trademark

Proman

Origin

Jiangsu China

HS Code

8422301090

Production Capacity

350sets/Year

Key features

High Production Capacity: Filling speed up to 2000 CPH for carbonated drinks, sealing up to 2400 CPH.
Versatile Filling Options: Supports isobaric pressure for carbonated drinks and normal pressure for non-carbonated beverages.
Durable SUS304 Construction: Whole machine frame and liquid tank constructed from high-quality SUS304 stainless steel.
Complete Production Line Solution: Provides full solution from depalletizing, rinsing, filling, sealing to pasteurization and packaging.
Customizable Machine Design: Customize material, power, filling type, and bottle types according to specific requirements.
Comprehensive Warranty Coverage: Includes 12 months warranty with life-long technical support for all machines.
Professional Installation & Training: Engineers visit factory for installation, manual provision, and employee training until proficient.
Global Technical Support: 24-hour engineer response time with spare parts delivery within 5 days via international courier.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤2.95hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is your factory located?
A:
Our factory is located in Zhangjiagang City, 2 hours drive from Shanghai and 1 hour drive from Wuxi. We can pick you up to visit if you arrive at Shanghai or Wuxi.
Q:Do you provide technical support for your machines?
A:
Yes, we have a professional team of engineers with extensive installation, debugging, and training experience abroad available to service machinery overseas.
Q:What is the warranty period for your machines?
A:
We offer a 1-year warranty on our machines and provide life-long technical support. You are always welcome to visit our company.
Q:Can the machine fill non-carbonated drinks?
A:
Yes, by changing the isobaric pressure filling valves to normal pressure filling valves, the machine becomes suitable for non-carbonated beverages like energy drinks and herbal tea.
Q:What is the lead time for production?
A:
The average lead time is one month during the off-season and 1-3 months during the peak season.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like