SourcingAI
Try for free
Powered by Made-in-China.com
Turnkey Project Soft Drink Bottled Water Beverage Fruit Juice Complete Bottling Line
US$12,800.00-48,000.00
1 Piece

Product profile

Customization

Available

Type

Volumetric Filling Machine

Automatic Grade

Automatic

Model NO.

PM

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Single-Room Feeding

Dosing Device

Capacity Cup

Filling Principle

Vacuum

Packaging Container Lifting Structure

Chute Pneumatic Combination Lifting

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic

Composition

Mineral Water Plant

Material

SS304

Certificate

CE,ISO,SGS

Electrics

Siemens,Mitsubishi,etc

Control System

PLC with Touch Screen

Workshop Layout

Free Design

Bottle Volume

200ml-2000ml

Capacity

2000bph to 24000bph

Exchange Parts

Free

Transport Package

Wooden Case

Specification

3.2m*1.8m*2.4m

Trademark

Proman

Origin

China

HS Code

8422301090

Production Capacity

150machines/Year Mineral Water Plant

Key features

Complete Turnkey Solution: Includes water purification, bottle blowing, and 3-in-1 washing, filling, and capping systems.
Wide Capacity Range: Models available from 1000 to 24000 bottles per hour to suit various factory sizes.
Flexible Bottle Sizes: Supports plastic bottles from 200ml to 2000ml with minimal changeover time.
Advanced PLC Control: Equipped with Mitsubishi PLC and Siemens/Mitsubishi electrics for stable, automatic operation.
Versatile Application: Suitable for mineral water, purified water, alcoholic beverages, and non-carbonated liquids.
Energy Efficient Design: Low water and electricity consumption with compact structure for small space occupation.
Professional Customization: Customizable material, power, filling type, and free workshop layout design based on requirements.
Lifetime Technical Support: 12-month guarantee with lifelong technical support and fast engineer response within 24 hours.

Company profile

Zhangjiagang Proman Machine Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/FactoryExport Year: 2006-09-12Nearest Port: shanghaiAverage Response Time: ≤3.01hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others

About Our Factory & Business Background

AddressYucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsChina Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are an industrial manufacturer located in Zhangjiagang City with over 21 years of experience in the industry.
Q:Where is your factory located?
A:
Our factory is in Zhangjiagang City, near Shanghai and Wuxi. We can arrange pickup if you arrive at these locations.
Q:Do you provide technical support?
A:
Yes, we have a professional engineering team with extensive overseas installation, debugging, and training experience.
Q:What is the warranty period?
A:
We provide a 12-month guarantee and lifetime technical support for our machines.
Q:What is the lead time for production?
A:
The lead time is one month during the off-season and 1-3 months during the peak season.

Send Inquiry

*To:Zhangjiagang Proman Machine Co., Ltd.Zhangjiagang Proman Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like