SourcingAI
Try for free
Powered by Made-in-China.com
Precision CNC Machined Components for HDPE, POM, UHMWPE, and Peek Applications
US$0.10-50.00
10 Pieces

Product profile

Customization

Available

Application

Hardware Tool, Machinery Accessory

Standard

GB

Model NO.

Customized according to customer requirements

Surface Treatment

CNC Machining

Production Type

Batch Production

Machining Method

CNC Machining

Material

UHMWPE

Colour

Black. Green, Blue

Standard Parts or Non-Standard Parts

Non Standard Parts

Tooth Height

Customizable

Type

Plastic Gear

Tooth Surface Hardness

Hard Tooth Surface

External Diameter

Customizable

Transport Package

Cartons or Wooden Pallets

Specification

Customized according to customer requirements

Trademark

Guangzhou Pinsheng

Origin

Celanese Raw Materials Are Imported From Germany

Key features

Superior Wear Resistance: Wear resistance exceeds carbon steel and brass, extending equipment life significantly.
Self-Lubricating Design: Static friction coefficient of 0.07 ensures smooth operation without external lubrication.
High Impact Strength: Impact strength is 10x nylon 66 and 20x PVC, ensuring durability in harsh conditions.
Chemical Corrosion Resistance: Stable against lye, sulfuric acid, nitric acid, and seawater for long-term reliability.
Customizable Specifications: Offers customizable colors, tooth height, and external diameter for specific needs.
Non-Sticky Surface: Weak surface absorption prevents material sticking, ideal for food and hygiene applications.
Health and Non-Toxic: Safe material composition suitable for food-grade machinery and accessories.

Company profile

Guangzhou Pinsheng Automation Industry Co., Ltd.
Importers and ExportersSelf-brandedPatents AwardedIn-stock Capacity
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 Years CertifiedNearest Port: Guangzhou PortAverage Response Time: ≤1.88h

About Our Factory & Business Background

AddressC2 Plant, Private Industrial Park, No. 1, Minying Avenue East, Xintang Town, Guangzhou
Plant Area1300 square meters
Number of Employees11
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Pc
Supply Chain Partners6

Our Production Capability & Technical Expertise

Main ProductsPolyethylene rod, Guide bar
Production Lines1
Production MachinesEngraving machine, Grinding machine, Vernier calipers
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2017-10-30
Main MarketsDomestic
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What materials are used for these CNC machined components?
A:
The components are made from Ultra-High Molecular Weight Polyethylene (UHMWPE), HDPE, POM, and Peek, with UHMWPE being the primary material for its superior properties.
Q:Is the product customizable?
A:
Yes, we offer full customization including colors (Black, Green, Blue), tooth height, and external diameter. We support customization from samples, designs, and minor adjustments.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1 piece, allowing for flexible purchasing for both small and large batches.
Q:How does the wear resistance of UHMWPE compare to metals?
A:
UHMWPE has exceptional wear resistance, being 1/7 that of carbon steel and 1/27 that of brass in wear index, making it superior to many metal materials.
Q:What is the lead time for production?
A:
The average lead time is one month, regardless of whether it is peak season or off-season.

Send Inquiry

*To:Guangzhou Pinsheng Automation Industry Co., Ltd.Guangzhou Pinsheng Automation Industry Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like