SourcingAI
Try for free
Powered by Made-in-China.com
Optimal Power Ex200-1 Turbocharger for Maximum Performance Boost
US$100.00-350.00
1 Piece

Product profile

Customization

Available

Body Material

Iron

Cold Style

Air-Cooled

Model NO.

114400-2100

Displacement

>4.0 L

Emission Standard

Euro 4, Euro 5, Euro 6, Tier 4

Engine Type

Inline Engine

Number of Cylinders

Six Cylinder

Start

Electric Start

Packing Size

130*89*130cm

Weight

15kg

Transport Package

Carton Box

Specification

800kg

Trademark

Qida

Origin

China

HS Code

8408909210

Production Capacity

50000PCS/Month

Key features

High Reliability: Advanced design and high-quality manufacturing ensure durability in harsh conditions.
Strong Power Output: High fuel injection pressure allows fuller combustion and lower emissions.
Fast Low-Speed Response: Holset turbocharger with integral wastegate valve offers better performance.
Wide Emission Compliance: Meets Euro 4, Euro 5, Euro 6, and Tier 4 emission standards.
Versatile Engine Models: Available in QSC8.3 series with rated power from 160kW to 194kW.
Customizable Packaging: Standard wooden boxes or special packing according to customer needs.
Flexible Shipping Options: Sea freight for large items; air shipment available for urgent small orders.
Global Market Reach: Main markets include North America, Europe, Asia, Africa, and Oceania.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2024-12-05Nearest Port: Shanghai, Qingdao, ShenzhenAverage Response Time: ≤1.47hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressRoom 06, Building B5-2, Zhuzhuang Logistics Park, Xiangzhou District, Xiangyang, Hubei, China
Plant Area705.52 square meters
Registered Capital1,000,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDiesel Engine, Diesel Engine Parts, Generator Set, Industrial Generator Set, Marine Generator Set, Silent Generator Set

Our Industry Experience & Global Business Record

Year of Establishment2024-11-25
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:How to buy engine spare parts?
A:
First of all, please tell us the part number of the parts you need. We will supply the same parts as yours. Secondly, if you don't know the part number, please provide parts name and engine series number, then we will check the part number through engine series number.
Q:How long is the delivery time?
A:
For complete engine and Power units , we need to arrange production according to the order, our general delivery time is 15-30 days. For spare parts , our general delivery time is 3-10 days.
Q:How to arrange delivery?
A:
Considering the large volume and weight of our products, to save the shipping cost, we generally recommend ship to your nearest port For small items and urgent orders, we can also provide air shipment and send goods to the airport in your city or your company address.
Q:How about Payment Methods?
A:
We suggest 30/70,T/T payment method: 30 percent down payment on placement of the order, with the remaining 70% due upon shipment.
Q:How about Packing Methods?
A:
Normally we use wooden boxes for packaging or we can pack it according to your special needs.

Send Inquiry

*To:Hubei Qida Machinery Co., Ltd.Hubei Qida Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

5327221 Turbocharger He300vg for Cummins Qsb6.7 Engine
Made-in-China.com