SourcingAI
Try for free
Powered by Made-in-China.com
High-Performance Zj50 Drilling Rig for Efficient Construction Projects
US$850,000.00-1,800,000.00
1 Piece

Product profile

After-sales Service

Yes

Warranty

Six Months

Condition

Used

Model NO.

ZJ50

Motor

AC Motor

Drill Hole Diameter

216mm-311mm

Drill Hole Depth

4500m-5000m

Bit Type

Tricone Bit, PDC Bit

Drilling Way

Rotary

Maximum Hook Load

3150 kN

Total Weight

Approx. 160 Tons

Drill Floor Height

7.5m

Effective Derrick Height

44.5~45m

Transport Package

Customization

Specification

Skid-mounted

Trademark

Qingchang

Origin

Dongying, Shandong, China

Key features

High renovation standards with all key components replaced, ensuring high reliability.
Extremely cost-effective with fast investment return.
Standard 5000m drilling capacity, full parameters qualified for deep well construction

Company profile

CertifiedBusiness Type: Trading CompanyNearest Port: qingdaoAverage Response Time: ≤6.76hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressNo. 6 Fengshou Road, Kenli District, Dongying, Shandong, China
Plant Area14071.1 square meters
Registered Capital10,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsOilfield Drilling Rig, Workover Rig, Oilfield Accessories, Wellhead&Downhole Tools

Our Industry Experience & Global Business Record

Year of Establishment2016-05-26
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Can it be customized and modified?
A:
Yes, we can upgrade and modify the equipment according to customer demands.
Q:What is the actual drilling depth and maximum hook load of ZJ50?
A:
Standard ZJ50/3150 model. Drilling depth reaches 5000m with 4.5 inch drill pipe, 4500m with 5 inch drill pipe. Rated maximum hook load is 315 tons, suitable for medium-deep well drilling.
Q:Is the failure rate high after renovation?
A:
All core worn parts are replaced with brand-new ones. The whole rig completes no-load and full-load trial operation and full-function inspection before delivery, with much lower failure rate than old unrenovated rigs.

Send Inquiry

*To:Dongying Qingchang Petroleum Machinery Co., Ltd.Dongying Qingchang Petroleum Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Beyond High Performance Xj550 Workover Rig for Oil Drilling
Made-in-China.com
Sucker Rod Drilling Rig for Small Project
Made-in-China.com
API Zj50 1500HP Skid-Mounted Drilling Rig for Oilfield

API Zj50 1500HP Skid-Mounted Drilling Rig for Oilfield

US$590,000.00-790,000.00
1 Piece(MOQ)
Made-in-China.com
Portable Trailer-Mounted Drilling Rig for Efficient Oil Extraction
Made-in-China.com
High Capacity Oil Drilling Rig Zj50/70

High Capacity Oil Drilling Rig Zj50/70

US$1,800,000.00-2,800,000.00
1 Set(MOQ)
Made-in-China.com