Powered by Made-in-China.com

Oilfield Drilling Mud Solids Control System
US$75,000.00-300,000.00
1 Piece
Product profile
After-sales Service
YesWarranty
6 MonthsPower Source
ElectricOperation Pressure
Atmospheric PressureMaterial
AlloyType
Complete Drilling Fluid Solid Control SystemMud Handling Capacity
120-240 M³/HWorking Pressure
200-400 KpaPower Supply
380V/50Hz or 440V/60HzControl Mode
Local Manual Operation + PLC Centralized Control (Ambient Temperature
-20℃ ~ +55℃, Suitable for Desert and Cold RegioMud Handling Capacity2
280-420 M³/HDesander
1-3Vacuum Degasser
180-240 M³/HShale Shaker
1-2Trademark
QingchangOrigin
Dongying, Shandong, ChinaKey features
The whole unit is disassembled, inspected and overhauled in strict accordance with oilfield industry standards. Core screening, cyclone and centrifugal components are fully inspected and refurbished,
Optimized sealing structure of all pipelines ensures smooth mud circulation without leakage. It achieves high-precision graded solid-liquid separation, effectively purifies drilling mud and cuts down
Upgraded power assembly and electric control system adapt to various oilfield power supply voltages. It features stable start-stop, low failure rate and strong adaptability to harsh field working cond
The frame undergoes complete rust removal, anti-corrosion treatment and repainting with reinforced load-bearing structure, extending service life obviously. Easy disassembly, transportation and instal
Full no-load and load linkage tests are completed before delivery, complete inspection quality reports are provided. Perfect after-sales maintenance support is available, featuring outstanding cost pe
Company profile

Dongying Qingchang Petroleum Machinery Co., Ltd.Shandong, China
CertifiedBusiness Type: Trading CompanyNearest Port: qingdaoAverage Response Time: ≤0.29hTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 6 Fengshou Road, Kenli District, Dongying, Shandong, China
Plant Area14071.1 square meters
Registered Capital10,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsOilfield Drilling Rig, Workover Rig, Oilfield Accessories, Wellhead&Downhole Tools
Our Industry Experience & Global Business Record
Year of Establishment2016-05-26
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:How long is the warranty period?
A:
6 months.
Q:Is this system fully refurbished?
A:
Yes, all units are completely disassembled, inspected, replaced worn parts, repainted and fully tested before delivery.
Q:What drilling rig model can it match?
A:
It can match ZJ20, ZJ30, ZJ40, ZJ50, ZJ70 land drilling rigs.
Q:What is the mud processing capacity?
A:
Standard flow rate is 120-240 cubic meters per hour.
Q:What is the price term and currency?
A:
We quote FOB China port price in US Dollar.
Send Inquiry
*To:
Dongying Qingchang Petroleum Machinery Co., Ltd.
Dongying Qingchang Petroleum Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Wear Resistant Oilfield Drilling Mud System for Oil Gas Solid Control Extraction
US$8,000.00-30,000.00
1 Set(MOQ)
Advanced Solid Control System for Oilfield Drilling Applications
US$18,000.00
1 Set(MOQ)
CE Certified Oilfield Drilling Mud System for Oil Gas Solid Control Engineering
US$8,000.00-30,000.00
1 Set(MOQ)
Top Grade Oilfield Drilling Mud System for Onshore Oil Gas Solid Control
US$8,000.00-30,000.00
1 Set(MOQ)
Drilling Rig Mud Circulation Solids Control System
US$10,000.00-50,000.00
1 Set(MOQ)
Customizable Oilfield Drilling Mud System for Oil Gas Solid Control Construction
US$8,000.00-30,000.00
1 Set(MOQ)
Advanced Drilling Mud Flare Ignition System for Efficient Solids Control
US$4,000.00-6,000.00
1 Piece(MOQ)
Durable Mud Solid Control System for Oil Drilling Operations
US$12,999.00-69,000.00
1 Piece(MOQ)
Drilling Mud Solids Control System for Oilfield Drilling
US$9,999.00-99,999.00
1 Piece(MOQ)
Certified Mud Mixing System with Agitator for Drilling-Fluid Preparation in Utilities/Micro-Tunneling/HDD/Oilfield Construction
US$3,800.00-11,200.00
1 Piece(MOQ)
Oilfield Drilling Solid Control System Mud Recycling System
US$1,000.00-500,000.00
1 Piece(MOQ)
Energy-Saving Mud Solid Control System for Drilling Operations
US$12,999.00-69,000.00
1 Piece(MOQ)
High-Efficiency Mud Mixing System for Drilling Fluid Mixing in HDD/Utilities/Micro-Tunneling/Oilfield Construction
US$3,800.00-11,200.00
1 Piece(MOQ)
Complete Oilfield Drilling Mud Solid Control System
US$1,999.00-100,000.00
1 Piece(MOQ)
Professional Manufacturer Oilfield Mud Skid Tank Drilling Mud Solid Control System
US$1,900.00-10,000.00
1 Piece(MOQ)
Oilfield Drilling Standard High-Pressure Movable Elbow Rotary Jointsolids Control System
US$33.00
50 Pieces(MOQ)
Solid Control System for Oilfield Drilling Mud Treatment
US$28,000.00-65,000.00
1 Piece(MOQ)
Heavy-Duty Mud Mixing System for Drilling-Fluid Preparation in HDD/Tunneling/Tbm/Boring/Oilfield Construction
US$3,800.00-11,200.00
1 Piece(MOQ)
High-Efficiency Mud Mixing System for Drilling Fluid Mixing in Utilities/HDD/Micro-Tunneling/Oilfield Construction
US$3,800.00-11,200.00
1 Piece(MOQ)
Oilfield Mud Solid Control System for Drilling Fluid Cleaning
US$28,000.00-65,000.00
1 Piece(MOQ)



















