SourcingAI
Try for free
Powered by Made-in-China.com
GF CE Approved Panels Scaffolding Construction Steel Prop Concrete Forms Plastic Formwork Accessories Green
US$100.00-120.00
500 Square Meters

Product profile

Customization

Available

After-sales Service

Quality Warranty

Warranty

Quality Warranty

Model NO.

Green Formwork

Certification

ISO, CE

Material

Steel

Type

Slab Formwork

Material.

Aluminium

Surface

Aluminium

Brand

GF

Place of Origin

China

Transport Package

Boxing

Specification

1812 189

Trademark

GF

Origin

China

Production Capacity

400tons/Month

Key features

Early Stripping Mechanism: Advanced system that shortens construction period and saves time through efficient panel removal.
High Erection Speed: Installation speed reaches 60-100 square meters per person per day for maximum efficiency.
Reduced Total Cost: Fewer panels required, significantly lowering transportation, storage, and overall project costs.
Minimal Labor Requirement: Only 3-4 workers needed to quickly set up and remove panels without requiring additional braces.
Superior Safety Stability: Independent table design with 6-direction moving restriction ensures a very stable construction system.
Global Certification: Products meet European, American, and Australian standards with ISO and CE certifications.
Versatile Material Options: Available in Aluminium and Steel materials to suit different project requirements and preferences.
Established Manufacturer: Over 20 years of experience with global branches in Germany, USA, Australia, and other regions.

Company profile

Qingdao Scaffolding Import and Export Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceMulti-language Pioneer
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2003-09-10Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: ≤5.90hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP

AI-Powered supplier vetting

SummaryThe supplier is a limited company with a focus on hardware machinery, tools, textiles, and formwork systems. It offers customization services and has significant export experience, with 90% of sales derived from exports over 22 years. Despite a lack of formal procedures for service capability and manufacturing contracts, the company provides after-sales services and has a clear procedure for handling complaints. Financial data for recent years is available. Innovation is supported by R&D efforts and ODM services, although there is no SDK availability. The supplier operates four production lines but lacks procedures for outsourcing and ongoing volume reconciliation. Its overseas service offerings include installation and maintenance services, albeit without overseas warehouse or showroom capabilities.
Supplier typeThe supplier is a combined, limited company that is part of a larger company group, providing a wide range of products including formwork and scaffolding.
After-Sales capabilityThe supplier has a clear procedure for handling customer complaints and offers comprehensive overseas services, such as equipment installation and maintenance.
R&D capabilityThe supplier has R&D capabilities, offers ODM services, and has introduced new products in the past year, though lacks SDK availability.
Customization capabilityThe supplier offers extensive customization options ranging from minor to full customization, showing strong design services capability.

Product Q&A

Q:What is the early stripping mechanism?
A:
It is an advanced system feature that allows for quick panel removal, significantly shortening the construction period and saving time.
Q:How many workers are needed for installation?
A:
Only 3-4 workers in a team are required to quickly and easily set up and remove the panels.
Q:What certifications does the product have?
A:
The products are certified with ISO and CE, and are manufactured according to European, American, and Australian standards.
Q:What materials are available for the formwork?
A:
The formwork is available in Aluminium and Steel materials, with customization options for brand and surface.
Q:What is the average lead time for orders?
A:
The lead time is 1-3 months during peak season and one month during the off-season.

Send Inquiry

*To:Qingdao Scaffolding Import and Export Co., Ltd.Qingdao Scaffolding Import and Export Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like