SourcingAI
Try for free
Powered by Made-in-China.com
High Projecting Scaffolding Construction Scaffold System Quick Coupler Andamios Multidireccionales Formwork Green
US$100.00-120.00
500 Square Meters

Product profile

Customization

Available

After-sales Service

Quality Warranty

Warranty

Quality Warranty

Model NO.

Green Formwork

Material

Steel

Type

Fixed

Structural Style

Tower Scaffolding

Framework

Frame Combined Scaffolding

Supporting Mode

Projecting Scaffolding

Lapping Form

High Formwork

Erection Position

Internal Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Props

Construction Properties

Building Scaffold

Material.

Steel, Aluminium, Plywood

Surface

Hot Dipped Galvanized, Powder Coated

Brand

QS

Place of Orgin

China

Transport Package

Metal Pallets

Specification

2m/3.6m, 1.75m/3m, 2.2m/4m

Trademark

QS

Origin

China

HS Code

73084000

Production Capacity

2000tons/Year

Key features

Early Stripping Mechanism: Shortens construction period, reduces panel count, and lowers transportation and storage costs.
High Erection Efficiency: Assembly speed reaches 60-100 square meters per person per day with simple set and removal.
Stable 6-Direction Safety: Independent table with 6-direction moving restriction ensures a very stable and safe system.
Minimal Labor Requirement: Only 3-4 workers in a team are needed to quickly and easily set up and remove panels.
Multi-Standard Compliance: Products are manufactured according to European, American, and Australian standards.
Global Service Network: 5 branch companies and 5 foreign offices ensure excellent services worldwide.
Customizable Options: Material, surface, and brand can be customized as per specific project requirements.
Quality Warranty Support: Comprehensive quality warranty and after-sales service provided for all products.

Company profile

Qingdao Scaffolding Import and Export Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceMulti-language Pioneer
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2003-09-10Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: ≤7.75hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP

AI-Powered supplier vetting

SummaryThe supplier is a limited company with a focus on hardware machinery, tools, textiles, and formwork systems. It offers customization services and has significant export experience, with 90% of sales derived from exports over 22 years. Despite a lack of formal procedures for service capability and manufacturing contracts, the company provides after-sales services and has a clear procedure for handling complaints. Financial data for recent years is available. Innovation is supported by R&D efforts and ODM services, although there is no SDK availability. The supplier operates four production lines but lacks procedures for outsourcing and ongoing volume reconciliation. Its overseas service offerings include installation and maintenance services, albeit without overseas warehouse or showroom capabilities.
Supplier typeThe supplier is a combined, limited company that is part of a larger company group, providing a wide range of products including formwork and scaffolding.
After-Sales capabilityThe supplier has a clear procedure for handling customer complaints and offers comprehensive overseas services, such as equipment installation and maintenance.
R&D capabilityThe supplier has R&D capabilities, offers ODM services, and has introduced new products in the past year, though lacks SDK availability.
Customization capabilityThe supplier offers extensive customization options ranging from minor to full customization, showing strong design services capability.

Product Q&A

Q:What is the erection speed of the Green Formwork?
A:
The erection speed is as high as 60-100 square meters per person per day.
Q:How many workers are required to operate the system?
A:
Only 3-4 workers in a team are needed to quickly and easily set up and remove the panels.
Q:What standards do the products comply with?
A:
All products are made as per European standard, American standard, and Australian standard.
Q:What is the lead time for orders?
A:
Peak season lead time is 1-3 months, while off-season lead time is one month.
Q:What are the payment terms?
A:
Terms of payment include LC (Letter of Credit) and T/T (Telegraphic Transfer).

Send Inquiry

*To:Qingdao Scaffolding Import and Export Co., Ltd.Qingdao Scaffolding Import and Export Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Construction Aluminum Formwork System
Made-in-China.com