SourcingAI
Try for free
Powered by Made-in-China.com
Modular Panel Design Shorten Construction Schedules Concrete Formwork System
US$100.00-120.00
500 Square Meters

Product profile

Customization

Available

Certification

ISO, Patent Certificate

Material

Steel

Type

Slab Formwork

Transport Package

Packages

Specification

1812

Trademark

GF

Origin

China

HS Code

73084

Production Capacity

400 Tons/Month

Key features

Early Stripping Efficiency: Supports early stripping to shorten construction cycles and accelerate project progress.
Enhanced Site Safety: Six-direction locking restraints eliminate overhead lifting above shoulder height.
Simplified Modular Design: No cross braces or tripods required; easy horizontal and vertical transport.
Reusable & Cost-Effective: Durable steel/aluminum frames with bamboo plywood; reduces storage space.
Stable Bearing Capacity: Standardized connections prevent loosening; ensures reliable load performance.

Company profile

Qingdao Scaffolding Import and Export Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceMulti-language Pioneer
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2003-09-10Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: ≤3.63hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP

AI-Powered supplier vetting

SummaryThe supplier is a limited company with six employees, four production lines, in-stock capability, and a product range focused on formwork, scaffolding, shoring, and related products. It reports 22 years of export experience, with exports accounting for 90% of total sales, and offers overseas installation, training, repair, maintenance, and debugging. The supplier demonstrates broad customization and ODM capabilities, has introduced new products within the past year, and provides OEM services for well-known brands. However, quality control appears limited to one inspector and packing-staff checks, while manufacturing lacks continuous quantity reconciliation and an outsourcing SOP. There is no valid manufacturing contract with related subcontractors, no overseas warehouse or showroom, and no available SDK. Financial credibility cannot be fully assessed from the provided records.
Supplier typeThe supplier is identified as a limited company with a combined company type, import and export business scope, six employees, and affiliated companies. Its business scope includes hardware machinery, hardware tools, textiles, clothing, and daily necessities, while its offered products are concentrated on formwork, scaffolding, and shoring.
After-Sales capabilityThe supplier has a clear procedure and records for handling customer complaints and offers overseas installation, training, repair, maintenance, and debugging. It also has in-stock capability, but lacks an overseas warehouse and showroom; service-capability assessment and corrective/preventive-action procedures are not documented.
R&D capabilityThe supplier reports new products within the past year and provides ODM services, indicating active product-development capability. However, it has no available SDK, so software-development support is not demonstrated.
Production capacityThe supplier reports four production lines, in-stock capability, laser cutting and stamping equipment, and 22 years of export experience. Production controls have material weaknesses: finished products are checked by packing staff, there is one quality assurance/QC inspector, no continuous batch quantity reconciliation, no outsourcing SOP, and no valid manufacturing contract with related subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. It also provides ODM services, supporting a broad stated customization range.
Client casesThe supplier states that it provides OEM services for well-known brands and has exported goods for 22 years, with exports representing 90% of total sales. These statements indicate brand-related and international customer experience, although no specific customer names, project details, or verifiable case studies are provided.

Product Q&A

Q:What structure is this green slab formwork mainly used for?
A:
It is specially designed for flat slab and beamless concrete structures in building construction.
Q:Does this formwork need cross braces and tripods during installation?
A:
No. The system adopts optimized structure, which eliminates cross braces and tripods to simplify assembly.
Q:How many workers are required for erection and stripping work?
A:
A team of only 3 to 4 workers can complete installation, stripping and removal efficiently.
Q:Does this system support early stripping operation?
A:
Yes. It supports early stripping process to accelerate construction progress and shorten project cycles.
Q:What safety advantages does the formwork system have?
A:
It adopts six-direction locking restraints for stable bearing. Workers do not need to lift materials above shoulder height.

Send Inquiry

*To:Qingdao Scaffolding Import and Export Co., Ltd.Qingdao Scaffolding Import and Export Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Advanced Versatile Formwork Systems with Modular Skydeck Design
Made-in-China.com
Durable Skydeck Construction Systems with Advanced Modular Designs
Made-in-China.com