Powered by Made-in-China.com

Steel Projecting Scaffolding Walk Through Frame Prop Construction Spring Clamp Formwork Green
US$100.00-120.00
500 Square Meters
Product profile
Customization
AvailableAfter-sales Service
Quality WarrantyWarranty
Quality WarrantyModel NO.
Green FormworkMaterial
SteelType
FixedStructural Style
Tower ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
High FormworkErection Position
Internal ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldMaterial.
Steel, Aluminium, PlywoodSurface
Hot Dipped Galvanized, Powder CoatedBrand
QSPlace of Orgin
ChinaTransport Package
Metal PalletsSpecification
2m/3.6m, 1.75m/3m, 2.2m/4mTrademark
QSOrigin
ChinaHS Code
73084000Production Capacity
2000tons/YearKey features
Early Stripping Mechanism: Shortens construction period and reduces total cost by allowing faster panel removal.
High Erection Speed: Erection speed reaches 60-100 square meters per person per day for maximum efficiency.
Stable Safety Design: Independent table with 6-direction moving restriction ensures a very stable system.
Low Labor Requirement: Only 3-4 workers needed to quickly and easily set up and remove panels.
Multi-Standard Compliance: Products manufactured according to European, American, and Australian standards.
Customizable Options: Material (Steel/Aluminium), Surface (Galvanized/Powder Coated), and Brand are customizable.
Global Service Network: 5 branch companies and 5 foreign offices ensure wide international support.
Quality Warranty: Comprehensive quality warranty service provided for all scaffolding and formwork products.
Company profile
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2003-09-10Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: ≤7.08hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP
AI-Powered supplier vetting
SummaryThe supplier is a limited company with a focus on hardware machinery, tools, textiles, and formwork systems. It offers customization services and has significant export experience, with 90% of sales derived from exports over 22 years. Despite a lack of formal procedures for service capability and manufacturing contracts, the company provides after-sales services and has a clear procedure for handling complaints. Financial data for recent years is available. Innovation is supported by R&D efforts and ODM services, although there is no SDK availability. The supplier operates four production lines but lacks procedures for outsourcing and ongoing volume reconciliation. Its overseas service offerings include installation and maintenance services, albeit without overseas warehouse or showroom capabilities.
Supplier typeThe supplier is a combined, limited company that is part of a larger company group, providing a wide range of products including formwork and scaffolding.
After-Sales capabilityThe supplier has a clear procedure for handling customer complaints and offers comprehensive overseas services, such as equipment installation and maintenance.
R&D capabilityThe supplier has R&D capabilities, offers ODM services, and has introduced new products in the past year, though lacks SDK availability.
Customization capabilityThe supplier offers extensive customization options ranging from minor to full customization, showing strong design services capability.
Product Q&A
Q:What is the erection speed of the Green Formwork?
A:
The erection speed is as high as 60-100 square meters per person per day.
Q:How many workers are needed to install the system?
A:
Only 3-4 workers in a team can quickly and easily set up and remove the panels.
Q:What standards do your products comply with?
A:
All our products are made as per European standard, American standard and Australian standard.
Q:What are the customization options available?
A:
Customization is available for Material (Steel, Aluminium, Plywood), Surface (Hot Dipped Galvanized, Powder Coated), and Brand.
Q:What is the lead time for orders?
A:
Peak Season Lead Time is 1-3 months, and Off Season Lead Time is one month.
Send Inquiry
*To:
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Hot Frame Combined Scaffolding Steel China System Prop Shoring Props Systems Formwork
US$100.00-120.00
500 Square Meters(MOQ)
QS Projecting Ringlock Steel Plank Walk Through Frame Scaffolding System Formwork Green
US$100.00-120.00
500 Square Meters(MOQ)
Projecting Scaffolding High Formwork Prop Construction System Scaffold Quick Steel Props Green
US$100.00-120.00
500 Square Meters(MOQ)
Quality Warranty High Scaffolding Walk Through Frame Formwork Spring Clamp Steel Props Green
US$100.00-120.00
500 Square Meters(MOQ)
Steel Walk Through Scaffold H Frame Formwork
US$2.50
500 Pieces(MOQ)
Comaccord Factory Direct Supply Steel Formwork Scaffolding Formwork for Construction
US$7.96
1,750 Pieces(MOQ)
Construction Steel Cuplock Scaffolding Formwork System
US$3.50
500 Pieces(MOQ)
Steel Scaffolding System Ringlock Cuplock Formwork for Building Construction
US$3.50
500 Pieces(MOQ)
Steel Scaffolding System Scaffolding Framework Scaffolding Formwork for Diverse Construction
US$3.00-30.00
100 Pieces(MOQ)
Steel Scaffolding Framework Scaffolding System Scaffolding Formwork for Diverse Construction
US$3.00-30.00
100 Pieces(MOQ)
Multifunctional Modular Steel Ringlock Scaffolding and Parts Price for Construction and Formwork
US$9.58-15.58
100 Pieces(MOQ)
Ringlock Scaffolding Used Slab Formwork for Scaffolding System
Negotiable
100 Pieces(MOQ)
Formwork Scaffolding Steel Prop Shoring Formwork for Construction Concrete
US$4.00
1,000 Pieces(MOQ)
Comaccord Jack Scaffold Shoring System Best Price Building Construction Scaffolding Formwork
US$7.96
1,750 Pieces(MOQ)
Wholesale Scaffolding/Scaffold Formwork for Construction
US$3.00-30.00
100 Pieces(MOQ)
Building Metal Scaffolding Steel Props Formwork Adjustable Acrow Prop OEM Factory
US$12.00
800 Pieces(MOQ)
Firm Connection Q235 Steel Formwork Scaffolding Concrete Scaffolding Industrial Design Scaffolding for Facade Work
US$1,150.00-1,200.00
10 Tons(MOQ)



















