SourcingAI
Try for free
Powered by Made-in-China.com
Key Pipe Clamp Fittings Hot Galvanize + Electric Galvanize 182
US$0.70
100-199 Pieces
US$0.60
200-299 Pieces
US$0.50
300+ Pieces
Sample price:US$4.00/piece.Request sample

Product profile

Customization

Available

Standard

ANSI

Material

Malleable Iron

Model NO.

182

Connection

Bolt Fastening

Surface Treatment

Galvanized Sheet

Head Type

Round

Delivery Time

30-45days

MOQ

200

Packing

as Customzied

Size

as Customzied

Transport Package

Put in Cartons Then on Pallets

Specification

182

Trademark

famous brand

Origin

China

HS Code

73084000

Production Capacity

100000piece/Month

Key features

Customized Size and Delivery: Size and delivery time are fully customizable to meet specific project requirements.
High-Quality Malleable Iron: Constructed from ASTM A197 Standard Malleable Iron for superior strength and durability.
Multiple Surface Treatments: Available in Hot Dip Galvanized, Electric Galvanized, and Black Powder Coated finishes.
Stainless Steel Screws: Equipped with stainless steel screws to ensure increased corrosion resistance.
Versatile Applications: Widely used in handrail systems, safety barriers, playgrounds, scaffolding, and greenhouses.
No Welding Required: Installation requires no welding, hot permits, or threading, making it cost-effective.
Free Sample Availability: Free samples are available with a preparation time of 7-10 days.
Stringent Quality Control: Optimal production techniques ensure consistent product quality and vibration resistance.

Company profile

Qingdao Fluido Industrial Co., Ltd.
High Repeat Buyers ChoiceManagement CertificationFast DeliveryIn-stock Capacity
Business Type: Manufacturer/FactoryExport Year: 2006-09-27Nearest Port: Qingdao, Tianjin, ShanghaiAverage Response Time: ≤2.28hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, Others, CIP, CPT

About Our Factory & Business Background

Address21floor, No. 5 Nanhai Zhi Road, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsCast Iron Valve, Cast Steel Valve, Ball Valve, Ductile Iron Pipe Fitting, Forged Flange, Pipe Clamp Fittings, OEM Metal Pipe Fittings, OEM Valve and Pump Parts, OEM Stamping Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the minimum order quantity?
A:
The minimum order quantity (MOQ) is 200 pieces.
Q:What materials are used for the fittings?
A:
The fittings are made of ASTM A197 Standard Malleable Iron with Stainless Steel screws.
Q:What surface treatments are available?
A:
Available options include Hot Dip Galvanized, Electric Galvanized, and Black Powder Coated.
Q:Can the product size be customized?
A:
Yes, the size is customizable to fit specific needs.
Q:What is the lead time for production?
A:
The delivery time is 30-45 days. During peak season, it takes one month, and off-season is within 15 workdays.

Send Inquiry

*To:Qingdao Fluido Industrial Co., Ltd.Qingdao Fluido Industrial Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like