Powered by Made-in-China.com
10-300kw Biogas Engine Generator Power Plant for CHP Project
US$12,360.00
1 Set
Product specifications
Flow Rate/M3/H
Sample price:US$5622.00/set.Request sample
Product profile
Customization
AvailableAfter-sales Service
Technical Support and 5% Quality Gurantee DepositWarranty
1 YearModel NO.
biogas generatorType
Comprehensive PlantMethod
Biological TreatmentUsage
Industrial, Home, Agriculture, HospitalOEM
Accpted Customized ProductsGas Source
BiogasOperation
7X24 HoursPower
10-300kwTransport Package
Wooden CaseSpecification
customizedTrademark
RELYOrigin
Qingdao ChinaHS Code
8419609090Production Capacity
60sets/YearKey features
High Efficiency Power Generation: Average efficiency over 32%, reaching up to 40% with advanced technology.
Eco-Friendly & Clean Energy: Meets Euro IV emission standards, reducing greenhouse gases and utilizing waste.
Cost-Effective Operation: Lower power generation cost compared to diesel and heavy oil fuel sources.
Stable Performance: Suitable for low concentration methane with significantly extended equipment cycle.
Comprehensive OEM Service: Accepted customized products and high-quality OEM services for specific needs.
1-Year Warranty Coverage: Includes technical support and a 5% quality guarantee deposit for assurance.
Wide Power Range: Available models ranging from 10KW to 300KW for diverse industrial applications.
Professional Technical Support: Free technical support, process design, and installation guidance provided anytime.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2020-11-01 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.41h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressRoom 810, Building 1, Hisense Caizhi Valley, No. 88, Zhuzhou Road, Qingdao, Shandong, China
Plant Area3600 square meters
Number of Employees20
Registered Capital30,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsBiogas Plant, Biogas Project, Biogas Digester & Biodigester, Biogas Tank, Biogas Purification Devices, Anaerobic Fermentation Tank, Biogas Generation CNG Plant, Sewage Treatment Plant, Mbr Domestic Sewasge Treatment Plant, Landfill Leachate Sewage Treatment Plant
Production MachinesLaser Cutting Machine, Angle Steel Joint Production Line, Lathe Machine, Milling Machine, Punch Press, Tapping Machine, Metal Deburring Machine, Thick Plate Punch Press, Hacksaw Machine, CNC Lathe
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2015-06-29
Main MarketsDomestic
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
Product Q&A
Q:What products do you produce?
A:
We specialize in drinking water treatment, industrial and domestic sewage treatment, air pollution control, organic waste treatment, and supply environmental water treatment chemical products.
Q:What information is needed before ordering?
A:
Please provide requirements for the overall treatment process, water quality report of influent/raw water, max treatment capacity, and quality demands or usage for effluent water.
Q:How long is the lead time?
A:
Generally 25 days, depending on your specific needs and project scales.
Q:Do you provide OEM services?
A:
Yes, we provide high-quality OEM services and can supply customized products for buyers.
Q:What other services can you provide?
A:
We offer free technical support at any time and can help design the entire treatment process for your project.
Send Inquiry
*To:
Qingdao Rely Environmental Technology Co., Ltd
Qingdao Rely Environmental Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Industrial Waste Water Treatment Project Sewage Treatment Plant for Biogas Utilization
US$328,000.00-356,000.00
1 Set(MOQ)
Custom Made Biogas Energy Power Plant for Assembly Pressed Steel Tank
US$315,000.00-342,000.00
1 Set(MOQ)
Sustainable Biogas Power Plant for Animal Waste Management
US$9,999.00-99,999.00
1 Set(MOQ)
300kw Anaerobic Lagoon Biogas Plant & Power Plant in Thailand
Negotiable
1 Piece(MOQ)
Uasb Technology for Biogas Plants and Wastewater Treatment Plants
US$45,000.00-50,000.00
1 Piece(MOQ)
High Efficiency Integrated Wastewater Treatment Plant for STP Projects
US$2,880.00-6,880.00
1 Set(MOQ)
Turnkey Integrated Wastewater Treatment Plant for Engineering Projects
US$1,150.00-2,500.00
1 Set(MOQ)
50-100m³ STP/Wwtp Package Sewage Treatment Plant for Tourist Attractions Hotel Projects Wastewater
US$1,150.00-2,500.00
1 Set(MOQ)
Automatic Integrated Sewage Treatment Plant for Small Town Projects
US$999.00-2,999.00
1 Set(MOQ)
Prefabricated Wastewater Treatment Plant for Fast Construction Project
US$1,150.00-2,500.00
1 Set(MOQ)
Integrated Wastewater Treatment Plant for Municipal and Rural Projects
US$1,150.00-2,500.00
1 Set(MOQ)
Compact Daf Sewage Treatment Plant for Power Plant Wastewater
US$8,400.00-8,500.00
1 Piece(MOQ)
Factory Direct Integrated Sewage Treatment Plant with Competitive Price for Wastewater Projects
US$3,000.00-30,000.00
1 Piece(MOQ)
Containerized Integrated Sewage Treatment Plant for Rapid Installation Wastewater Projects
US$3,000.00-30,000.00
1 Piece(MOQ)
Carbon Steel Anaerobic Digester Biogas Plant for Organic Waste Treatment
US$12,000.00-14,000.00
1 Piece(MOQ)
OEM Integrated Sewage Treatment Plant for Wastewater Projects with Global Distributor Cooperation
US$3,000.00-30,000.00
1 Piece(MOQ)
Hot Product Carbon Steel Biogas Digester Anaerobic Reactor Plant for Sewage Treatment
US$301,000.00-328,000.00
1 Set(MOQ)



















