Powered by Made-in-China.com
Multi Type Spray Tower for Industrial Waste Gas Pollution Control
US$800.00-1,400.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
1yearWarranty
1yearModel NO.
SS-UCondition
NewCertification
QS, ISO, CEAutomation
AutomaticScrew
Multi-ScrewTreatment
Chemical TreatmentColor
CustomizePackage Gross Weight
2000.000kgStandard Warranty
12 MonthsGlobal Support
24/7 Technical Assistance and Spare Parts SupplyTraining
Remote Operation/Maintenance TrainingUsage
Gas PurificationTransport Package
Plywood Non-Fumigation Wooden BoxSpecification
600.00cm * 200.00cm * 200.00cmTrademark
ShanshuiOrigin
ChinaKey features
Made of thick 304/316 stainless steel, high temperature and strong acid resistance, perfectly fit high-heat corrosive incineration flue gas working conditions.
Multi-layer high atomization spray system, efficient neutralization of SO2, HCl and capture heavy metal fly ash to meet strict waste incineration emission standards.
Integrated automatic circulating water & chemical dosing system, stable continuous operation, low labor and reagent consumption.
Optimized internal flow channel design with built-in demister, effectively eliminate entrained water mist and avoid white smoke emission.
Customizable tower diameter, height and processing air volume, suitable for municipal, medical and hazardous waste incineration projects.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤4.41h
About Our Factory & Business Background
AddressNo. 1199, Dongyuan Road, Lingang Industrial Park, Qingdao, Shandong, China
Plant Area6600 square meters
Number of Employees14
Registered Capital16,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Pc
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsWastewater Treatment Equipment, Exhaust Gas Treatment Equipment
Production Lines1
Production MachinesBending Machine, Cutting Machine, Drilling Machine, Heating Machine, Plasma cutting machine, Shearing Machine, Welding Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2009-09-17
Main MarketsEurope, Southeast Asia/ Mideast, Domestic
Repeat Buyers Choice50%~80%
Annual Export Revenue52,353,160 RMB
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500Yes
Product Q&A
Q:What's the lead time for orders?
A:
Standard models ship in 15-30 days, customized units require 30-50 days.
Q:Can you design products according to my needs?
A:
Of course, we have our own product design and technical team to meet your personalized customization needs.
Q:Are you a manufacturer or a trader?
A:
We are an equipment manufacturer in a physical factory. I can show you a demonstration video of our factory.
Q:What documents do you provide for export?
A:
Full export package (Commercial Invoice, Packing List, Bill of Lading, etc.).
Q:How do I place an order?
A:
Contact us via email/phone for a quote, then confirm with a PO.
Send Inquiry
*To:
Qingdao Shanshui Environmental Technology Co., Ltd
Qingdao Shanshui Environmental Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Pph Spray Tower, Acid Gas Treatment and Scrubbing System, Industrial Waste Gas Chemical Fume Purification Tower
US$2,500.00-8,000.00
1 Set(MOQ)
Large Flow Industrial Spray Tower for Plastic Workshop Waste Air Purify
US$800.00-1,400.00
1 Piece(MOQ)
Multi Layer Packing Cyclone Spray Tower Industrial Exhaust Gas Cleaning Device
US$1,100.00-1,360.00
1 Piece(MOQ)
High-Performance Purification Tower for Industrial Waste Gas Management
US$2,500.00-8,000.00
1 Set(MOQ)
Spray Tower for Industrial Odor Treatment
US$999.00-19,999.00
1 Piece(MOQ)
Stainless Steel 316 Spray Tower for Waste Gas Treatment
US$3,500.00-35,000.00
1 Piece(MOQ)
Industrial PP Spray Tower for Efficient Acidic Waste Gas Purification
US$693.00
2 Sets(MOQ)
Industrial Cyclone Spray Tower for Process Exhaust Cleaning
US$999.00-9,999.00
1 Piece(MOQ)
Industrial Spray Tower for Air Emission Control
US$999.00-19,999.00
1 Piece(MOQ)
Cyclone Tower for Environmental Protection Industrial Machinery Waste Gas Treatment Separator
US$2,650.00-4,680.00
1 Set(MOQ)
Dust Proof Odor Control FRP Spray Tower for Industrial Surface Treatment Exhaust Gas Processing
US$2,699.00-8,699.00
1 Piece(MOQ)
Corrosion-Resistant Spray Tower for Industrial Waste Gas Treatment
US$2,500.00-8,000.00
1 Set(MOQ)
Industrial FRP Spray Scrubber Tower for Acid Mist Absorption Cutting
US$2,480.69-18,682.25
1 Set(MOQ)
High Efficiency Industrial Spray System Waste Gas Purification Absorption Tower
US$2,000.00-20,000.00
1 Piece(MOQ)
Cross-Border Stainless Steel Industrial Acid Mist Waste Gas Purification Spray Tower
Negotiable
1 Piece(MOQ)
Industrial Waste Gas Treatment Spray Tower for Printing Paint Exhaust Gas
US$1,190.00-1,899.00
1 Piece(MOQ)
Advanced Cyclone Spray Tower with Integrated Electrostatic Precipitator for Dust Control
US$1,129.00
1 Piece(MOQ)
FRP Air Spray Tower Pump Motor Core Absorption Column Scrubber for Industrial
US$2,480.69-18,682.25
1 Set(MOQ)



















