SourcingAI
Try for free
Powered by Made-in-China.com
S13-100/10 10kv 100kVA Oil Immersed Distribution Transformer, High Efficiency
US$2,810.29-3,211.76
1 Piece

Product profile

Customization

Available

Application

Electronic

Phase

Three

Model NO.

S13-100/10

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001, CCC

Usage

Single-phase Transformer

Frequency Characteristics

Power Frequency

Shape of Core

EI

Brand

Quanshi

Shipping Time

35 Days

Trade Terms

Fob,CIF,CFR and So on

Export

Africa,The Middle East,South America and So on

MOQ

1 PC

Capacity

10000 PCS One Month

Rated Capacity

80 kVA

No-Load Loss

130W

Load Loss

1310/1250 W

Short-Circuit Impedance

4.0%

No-Load Percent

1.2 %

Core Weight

295 Kg

Oil Weight

110 Kg

Total Weight

510 Kg

Rail Gauge

550 mm

Transport Package

Wooden Box

Specification

770×760×860 mm

Trademark

QUANSHI

Origin

Linyi Shandong

HS Code

85043390

Key features

High Short-Circuit Withstand: Robust mechanical structure resists destructive forces of sudden short-circuit currents.
Low Loss Energy Saving: S13 series design ensures ultra-low no-load and load losses for efficiency.
ISO9001 & CCC Certified: Manufactured under stringent quality management and compulsory certification.
OEM/ODM Customization: Provide engineering drawings or lists; engineers will arrange custom solutions.
Fast Delivery & Samples: Mass production in 2-3 weeks; samples under $10 are free.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2025-01-02Nearest Port: qingdaoAverage Response Time: ≤5.43hTerms of Payment: Money Gram, LC, T/T, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressB-803, Building 1, Yigao Shanghai Street, Liuqing Subdistrict, Lanshan District, Linyi City, Shandong Province, China
Plant AreaN/A square meters
Registered Capital3,000,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDistribution Box,Power Cabinets,Oil-Immersed Transformers,Pz30 Modular Circuit Boxes,Dry-Type Transformers

Our Industry Experience & Global Business Record

Year of Establishment2025-03-18
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:How does the transformer handle short-circuit currents?
A:
It has a robust mechanical structure and optimized electrical parameters to resist destructive forces, preventing deformation or fire hazards.
Q:What certifications does the product have?
A:
The product is certified with ISO9001 and CCC, ensuring consistent quality and reliability.
Q:Can I get a sample to check quality?
A:
Yes, samples are available at a very low price, and those under $10 are free.
Q:How do you guarantee product quality?
A:
We perform material inspection, first production inspection, sampling inspection, and 100% pre-shipment inspection by QC assistants.
Q:What is the lead time for orders?
A:
Samples take about 1 week, while mass production takes 2-3 weeks.

Send Inquiry

*To:Linyi Zhengheng New Energy Technology Co., Ltd.Linyi Zhengheng New Energy Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like