SourcingAI
Try for free
Powered by Made-in-China.com
Surface Mount Power Distribution Box (PZ30 Compliant) - Metal Electrical Panel & Control Cabinet
US$6.70
10-99 Pieces
US$5.36
100-499 Pieces
US$4.73
500+ Pieces
Sample price:US$0.00/piece.Request sample

Product profile

Customization

Available

Type

Distribution Metering Box

Structure

Protection

Model NO.

Pz-30 National Standard Exposed

Certification

ISO9001:2000, CCC

Form

Partly-welded Type

Operation Voltage

Low Voltage

Size

1 Uint

Application Range

High-rise Buildings

Shell Material

Steel Plate

Shell Protection Grade

IP30

Brand

Zheng Heng

Thickness

0.8*0.7mm

OEM

Accept

MOQ

10

Way

12

Style

National Standard

Trade Terms

Fob, CIF, DDP

Main Products

Distribution Box, Pz30 Modular Circuit Boxes, Powe

Window Color

Transparent

Color

Grey

Box Material

High Quality Hot-DIP Galvanized Steel Plate

Transport Package

Carton

Specification

308*280*90mm

Trademark

ZHENG HENG

Origin

China

HS Code

8538109000

Key features

PZ30 National Standard Compliance: Meets PZ30 national standards for safe and reliable power distribution.
Durable Galvanized Steel Construction: Made of high-quality hot-dip galvanized steel plate for corrosion resistance.
Transparent ABS Plastic Cover: Top cover made of PS transparent plastic for easy observation and operation.
Wide Wiring Space Design: Wide box body provides sufficient space for wiring and component installation.
Frame-Type Guide Rail System: Equipped with guide rails for convenient disassembly and connection of lines.
Multiple Installation Options: Available in open wall-mounted and concealed embedded styles.
Customizable Way Configuration: Specifications range from 4 to 60 ways to suit various needs.
ISO9001 and 3C Certified: Product has passed ISO9001 and 3C certifications with traceable raw materials.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2025-01-02Nearest Port: qingdaoAverage Response Time: ≤7.45hTerms of Payment: Money Gram, LC, T/T, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressB-803, Building 1, Yigao Shanghai Street, Liuqing Subdistrict, Lanshan District, Linyi City, Shandong Province, China
Plant AreaN/A square meters
Registered Capital3,000,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDistribution Box,Power Cabinets,Oil-Immersed Transformers,Pz30 Modular Circuit Boxes,Dry-Type Transformers

Our Industry Experience & Global Business Record

Year of Establishment2025-03-18
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What should we do if the order is delayed for delivery?
A:
If there is a delay due to objective reasons (such as logistics restrictions during the pandemic), we will notify you as soon as possible after confirmation. Such situations rarely occur, and we will actively follow up and handle them to ensure prompt delivery. Please keep your order documents safe and maintain smooth communication. We will do our best to coordinate.
Q:What should be done if customs clearance is blocked?
A:
Please ensure that the provided product information (such as model number, material description, certification documents) is complete and accurate. In case of customs clearance issues, we will assist you in supplementing or updating the necessary documents and coordinate with the logistics party to quickly resolve the problem. It is recommended to understand the entry requirements of the destination country in advance to reduce the risk of delays.
Q:What should I do if the technical parameters do not match the requirements?
A:
Before placing the order, please make sure to check the technical drawings or confirm the samples. If any discrepancies are found after receiving the goods, please provide specific data for comparison. We will verify the situation and negotiate a solution (such as replacing parts or re-delivering) to ensure compliance with the usage requirements.
Q:What should be done if abnormal operation occurs after installation?
A:
Please first refer to the troubleshooting guide provided with the product to check the wiring and the environment. If the problem persists, please record a video of the scene and describe the phenomenon. Our engineers will provide remote guidance or arrange local technical support within 24 hours.
Q:What is the lead time for orders?
A:
The average lead time is within 15 workdays for both peak season and off-season.

Send Inquiry

*To:Linyi Zhengheng New Energy Technology Co., Ltd.Linyi Zhengheng New Energy Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like