SourcingAI
Try for free
Powered by Made-in-China.com
Three Phase Custom Electrical Panel Board Switch Cabinet Metal
US$59.08
10 Pieces

Product profile

Customization

Available

Type

Distribution Metering Box

Structure

Protection

Model NO.

Power Cabinet

Certification

ISO9001:2000, CCC

Form

Partly-welded Type

Operation Voltage

Low Voltage

Size

1 Unit

Application Range

High-rise Buildings

Shell Material

Steel Plate

Shell Protection Grade

IP54

Brand

Zheng Heng

Door Thickness

1.2-1.5 mm

Cabinet Thikness

1-1.2mm

Model Number

XL-21

OEM

Accept

Installation Type

Floor Standing

MOQ

10

Style

National Standard

Trade Terms

Fob, CIF, DDP

Main Products

Distribution Box, Pz30 Modular Circuit Boxes, Powe

Color

Grey

Certificate

CCC, ISO9001

Box Material

Galvanized Steel

Transport Package

Carton

Specification

1200*600*400mm

Trademark

ZHENG HENG

Origin

China

HS Code

8538109000

Key features

IP54 Protection Grade: Resists dust and water splashes, suitable for outdoor and harsh environments.
Customizable Dimensions: Door thickness 1.2-1.5mm and cabinet thickness 1-1.2mm can be adjusted.
Durable Steel Construction: Galvanized steel plate with electrostatic spraying for corrosion and rust resistance.
Modular Assembly Design: Separate assembly reduces transportation costs and facilitates maintenance.
OEM/ODM Support: Accepts OEM orders and provides customized power distribution solutions.
Certified Quality: Passes ISO9001 and CCC certifications with traceable raw materials.
Versatile Application: Ideal for industrial lines, system integration, and high-rise buildings.
Professional Engineering: Supports exclusive plan customization by professional engineers.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2025-01-02Nearest Port: qingdaoAverage Response Time: ≤1.33hTerms of Payment: Money Gram, LC, T/T, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressB-803, Building 1, Yigao Shanghai Street, Liuqing Subdistrict, Lanshan District, Linyi City, Shandong Province, China
Plant AreaN/A square meters
Registered Capital3,000,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDistribution Box,Power Cabinets,Oil-Immersed Transformers,Pz30 Modular Circuit Boxes,Dry-Type Transformers

Our Industry Experience & Global Business Record

Year of Establishment2025-03-18
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What should we do if the order is delayed for delivery?
A:
If there is a delay due to objective reasons (such as logistics restrictions during the pandemic), we will notify you as soon as possible after confirmation. Such situations rarely occur, and we will actively follow up and handle them to ensure prompt delivery. Please keep your order documents safe and maintain smooth communication. We will do our best to coordinate.
Q:What should be done if customs clearance is blocked?
A:
Please ensure that the provided product information (such as model number, material description, certification documents) is complete and accurate. In case of customs clearance issues, we will assist you in supplementing or updating the necessary documents and coordinate with the logistics party to quickly resolve the problem. It is recommended to understand the entry requirements of the destination country in advance to reduce the risk of delays.
Q:What should I do if the technical parameters do not match the requirements?
A:
Before placing the order, please make sure to check the technical drawings or confirm the samples. If any discrepancies are found after receiving the goods, please provide specific data for comparison. We will verify the situation and negotiate a solution (such as replacing parts or re-delivering) to ensure compliance with the usage requirements.
Q:What is the minimum order quantity (MOQ)?
A:
The MOQ is 10 units.
Q:What are the available payment terms?
A:
We accept Money Gram, LC, T/T, D/P, PayPal, Western Union, and Small-amount payment.

Send Inquiry

*To:Linyi Zhengheng New Energy Technology Co., Ltd.Linyi Zhengheng New Energy Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like