SourcingAI
Try for free
Powered by Made-in-China.com
Euro 5 Engine 4t 21m 4WD 4ws Telescopic Boom Forklift with Self Leveling Fork Telehandler Vehicle
US$149,000.00
1 Units

Product profile

Customization

Available

After-sales Service

by Dealer,Online Talk Service,DHL Free Parts

Warranty

2500 Working Hours or 1 Year

Model NO.

HZTHR4020

Cab Location

Left(Customizable)

Type

Telehandler

Power

Diesel Engine

Load Capacity

4t

Fuel

Diesel

Load center

>500mm

Lift height

20m

Condition

New

Operating Temperature

-25°C to +35°C

Storage Temperature

-40°C to +80°C

Power(Kw@Rev)

115/2200

Engine

Qsf3.8 Euro 5

Torque (Nm@Rev)

620/1500

Maximum Walking Speed

30km/H

Transport Package

Comply with Export Packaging Requirements

Specification

7180*2490*3120mm

Trademark

Hua Drill

Origin

China

HS Code

8427209000

Production Capacity

10000/Year

Key features

High Load Capacity: 4-ton lifting capacity suitable for heavy industrial and construction tasks.
Extended Reach: 20-meter telescopic boom height for high-level lifting operations.
360-Degree Rotation: Full 360-degree continuous rotation for maximum operational flexibility.
Off-Road Capability: 4WD drive and 4WS steering designed for harsh field and mine conditions.
Euro 5 Engine: Cummins QSF3.8 engine with 115kW power meeting international emission standards.
Self-Leveling System: Automatic leveling system ensures stability during lifting and transport.
Cab Comfort: ROPS/FOPS Level 2 cab equipped with air conditioning and heating.
Customizable Cab: Cab location is customizable to Left or Right side for specific needs.

Company profile

Hunan Hua Drill Intelligent Technology Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceR&D Capabilities
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 2 Years CertifiedNearest Port: Changsha Port, Shanghai PortAverage Response Time: ≤5.07h

About Our Factory & Business Background

Address11th Floor, Comprehensive Building, No. 1320 Kaiyuan East Road, Xingsha Industrial Base, Changsha Economic and Technological Development Zone
Terms of PaymentT/T, LC
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Supply Chain Partners2

Our Production Capability & Technical Expertise

Main ProductsForklift, Telehandler, 3 Ton 7 M Telehandler, 4 Ton 18 M Telehandler, 5 Ton 18 M Telehandler, 4 Ton 7 M Telehandler, 5 Ton 7 M Telehandler
R&D Engineers1 people

Our Industry Experience & Global Business Record

Year of Establishment2023-09-18
Main MarketsEurope
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff2
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Product Q&A

Q:What about the delivery time?
A:
60 days after receiving the deposit.
Q:What about the warranty time?
A:
12 months after shipment or 2500 working hours, whichever occuts first.
Q:What is the proportion of the deposit?
A:
30% By TT and balance before ship.
Q:what is the transport solution?
A:
For 4007-4507-5007 by 40HQ container with 2 units. for 4018 by 40HQ container with 2 units.
Q:What type of transmission?
A:
standard telehandler with hydrostatic type transmission, optional : Engine with torque converter.

Send Inquiry

*To:Hunan Hua Drill Intelligent Technology Co., Ltd.Hunan Hua Drill Intelligent Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

4WD Boom Telescopic Three-Ton Forklift with Air Conditioner
Made-in-China.com