SourcingAI
Try for free
Powered by Made-in-China.com
Advanced Denox Catalyst Solutions for Coal-Fired Power Plants
US$2,500.00
1 cubic meter
Sample price:US$800.00/piece.Request sample

Product profile

Customization

Available

CAS No.

13463-67-7/1314-35-81314-62-1/7631-86-9/65997-17-3

Formula

TiO2/Wo3/V205/Sio2

Model NO.

DRC18

EINECS

236-675-5/215-231-4/215-239-8/231-545-4/266-046-0

Status

Solid Catalyst

Response Type

Restore

Classification

Heterogeneous Catalysts

Usage

Positive Catalyst

Effect Size

Primary Catalysts

Manufacturing Method

Impregnation Method

Application Industry

Industry

Operating Temperature

240 to 420 Degrees Celsius

Carrier Material

Glass Fiber

Operating Conditions

Customized as Required

Transport Package

Plastic Stretch Film and Wooden Pallets

Specification

TiO2V2O5WO3MoO3

Origin

Xi'an City, Shaanxi Province, China

HS Code

3815190000

Production Capacity

10000cubic Meter/Year

Key features

High denitration efficiency with excellent corrosion resistance and thermal shock resistance.
Advanced production technology and complete equipment ensure reliable long term operation under challenging conditions such as high dust and high sulfur.
Dimensions can be customized based on boiler parameters, delivering a cost effective and reliable NOx control solution .

Company profile

Business Type: Manufacturer/FactoryExport Year: 2026-03-20Average Response Time: >24hTerms of Payment: T/TInternational Commercial Terms(Incoterms): FOB, EXW

About Our Factory & Business Background

AddressNo. 1888, Jixing Road, Gaoling District, Xi'anCity, Shaanxi, Province, China.
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months

Our Production Capability & Technical Expertise

Main ProductsSCR Denox Catalyst, Flue Gas Denitration Device, Flue Gas Denitration Catalyst

Our Industry Experience & Global Business Record

Main MarketsNorth America, Eastern Asia

Product Q&A

Q:What are the key features of your catalysts?
A:
High denitration efficiency, light weight, abrasion resistance, corrosion resistance, and thermal shock resistance. DRC50 for gas, DRC15/25 for coal-fired applications.
Q:What is your lead time?
A:
Typically 4 to 6 weeks after order confirmation, depending on quantity and specs. Expedited service available.
Q:Can you customize catalyst dimensions?
A:
Yes. Dimensions are designed based on your boiler size, flue gas flow, and space constraints. We provide tailor made solutions.

Send Inquiry

*To:Qiyuan (Xi'an) Dae Young Environmental Protection Technology Co., LtdQiyuan (Xi'an) Dae Young Environmental Protection Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

PRO Grade 96% Dbsa for Industrial Cleaning Solutions
Made-in-China.com