SourcingAI
Try for free
Powered by Made-in-China.com
Generator Speed Control Module DC6 Dual Original Pandaros Speed Governor Heinzmann Pandaros DC 6
US$1,850.00-1,999.00
1 Piece

Product profile

Customization

Available

Conditions of Use

Trailer Type, Marine, Land Use

Usage

Standby Unit, Common Units

Output Type

AC Three Phase

Cooling Method

Water Cooling

Installation Method

Fixed

Generator Type

Gas Generator

Name

Digital Controller

Model

DC6

Signal Mode

Current or Voltage

Source

Original Imported

Stock

10PCS

MOQ

1set

Lead Time

1-3 Days

Transport Package

Plywood Case

Specification

2kg/set

Trademark

HEINZMAN DC6

Origin

Ger.

HS Code

8511800000

Production Capacity

100 PC /Quarter

Key features

Original Heinzmann Brand: Genuine Pandaros DC6 speed governor with original imported source.
Wide Application Scope: Suitable for trailer, marine, and land use in standby or common units.
Fast Lead Time: Delivery within 1-3 days for standard orders depending on quantity.
High Stock Availability: 99% of spare parts are available in stock for immediate shipment.
Flexible Payment Terms: Supports Trade Assurance, TT (30%+70% or 100%), and L/C.
Global Delivery Options: Shipping via sea, air, or express (FedEx, DHL, UPS) to your door.
Customized Packing: Neutral cartons, pallets, or plywood cases available based on needs.
Emergency Support: Express delivery to Thailand in 6-8 days; Africa in 8-15 days.

Company profile

Business Type: Trading CompanyAverage Response Time: ≤0.81h

AI-Powered supplier vetting

SummaryJinan Ronghuan International Trade Co., Ltd. is identified as a limited trading company with three employees and no stated parent-group affiliation. Its offered products are engine spare parts, gas generators, and diesel generators, supported by broader machinery, generator, equipment, and spare-parts sales scopes. The supplier reports five years of export experience and offers customization from samples, designs, and minor modifications. However, no SDK is available, and only one year of R&D engineer experience is stated. Quality and after-sales controls are weakly documented: there are no written corrective-action or customer-complaint procedures, quality assurance and traceability statuses are unknown, and quality-control test equipment is recorded as zero. Audit information identifies CTI and an SGS report period from April 2, 2025 to April 1, 2026, but no certification held or positive audit outcome is explicitly established. Financial records are referenced for 2022–2024, but no performance results...
Supplier typeThe supplier is explicitly classified as a trading company and limited company, with three employees and no stated affiliation with a larger group. Its primary offerings are engine spare parts, gas generators, and diesel generators.
After-Sales capabilityThe supplier states general commitments to service and zero complaints, but it has no written procedures or records for corrective/preventive actions or customer-complaint handling. This indicates documented after-sales capability is lacking.
R&D capabilityThe supplier reports no available SDK and only one year of total R&D engineer experience. These explicit limitations do not support a strong innovation-capability assessment.
Production capacityThe supplier is identified as a trading company rather than a manufacturer, and its employee count is three. Quality-control test equipment is recorded as zero, while quality assurance and traceability statuses are unknown; no direct production capacity is demonstrated.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, and minor customization. This directly supports a positive assessment for the stated customization field.

Product Q&A

Q:What is your packing?
A:
Carton, pallet or plywood case, depends on quantity.
Q:How is the shipment handled?
A:
By sea, air or express, as your needs.
Q:What payment choices are available?
A:
Trade here on MIC, TT(30%+70%,or 100%),L/C.
Q:What is the lead time?
A:
1-7 working days, depends on quantity.
Q:What is the storage capacity?
A:
99% Spare parts are available in stocks. If in emergency, 8-15 days can arrive in Africa. 6-8 days deliver to Thailand by express.

Send Inquiry

*To:Jinan Ronghuan Industry and Trade Co., Ltd.Jinan Ronghuan Industry and Trade Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like