SourcingAI
Try for free
Powered by Made-in-China.com
A342 Carbon Steel Powder Coated Master Link for Construction Sites
US$0.23-6.99
10 Pieces
Sample price:US$0.00/piece.Request sample

Product profile

Customization

Available

Product Name

A342 Master Link

Size

3/4" to 4"

Model NO.

A342

Color

Red, Yellow, Blue

Certificates

ISO9001, CE, BV

Process

Heat Treatment+Surface Treatment

Wll

4.2t-112.14t

Grade

G80/100

MOQ

10PCS

Feature

Western Union, T/T

Trade Term

Fob, CFR, CIF

Shipment

by Sea, Air or Express

Lead Time

Within 10 Works Days After Receive Deposit

Application

Lifting Chain Slings, Webbing Slings

Sample

Available

Business Type

Manufacturer and Exporter

Transport Package

Carton Packing, Then in Pallets.

Specification

Alloy steel

Trademark

First rigging

Origin

China

HS Code

7326909000

Production Capacity

150 Tons/Month

Key features

High Strength Alloy Steel: Forged from special alloy steel with high intensity and toughness for durable performance.
Strict Quality Testing: 100% magnetic particle inspection and proof tested to 2.5 times the Working Load Limit.
Corrosion Resistant Coating: Plastic powder coating in Red/Yellow provides anticorrosion and long service life.
Wide Application Range: Ideal for lifting in factories, construction sites, mining, ports, and building projects.
Flexible Customization: OEM/ODM services available with customization from samples, designs, or full custom options.
Certified Manufacturer: ISO9001, CE, BV certified with independent import/export rights and coal safety certification.
Fast Delivery Service: Most orders delivered within 2-3 weeks with 24-hour online customer support.
Traceable Identification: Each link features a Product Identification Code (PIC) for full material traceability.

Company profile

Weifang First Rigging Co., Ltd.
High Repeat Buyers ChoiceQuality AssuranceManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.99h

AI-Powered supplier vetting

SummaryThe supplier, First Rigging, specializes in hardware products such as chains and rigging equipment, with a strong export focus. It operates three production lines and holds relevant certifications like ISO 9001:2015. Despite having structured procedures for after-sales service, it lacks documented records. The company shows limited innovation capability but does provide OEM services for well-known brands and offers a wide range of customization options from samples and designs.
Supplier typeFirst Rigging is a combined company that integrates R&D, manufacturing, sales, and service, focusing on hardware products such as chains and rigging.
CertificationsThe supplier holds ISO 9001:2015 certification and can provide certificates from renowned classification societies like CCS, LR, and DNV.
R&D capabilityThe supplier lacks research and development capability with no available SDK and has minimal R&D engineer experience.
Production capacityFirst Rigging operates three production lines with significant annual output across various product categories, but lacks ongoing volume reconciliation.
Customization capabilityThe supplier offers extensive customization services, including full customization from samples and designs.
Client casesThe supplier's products are globally distributed and have received positive customer feedback, especially from America and Canada.

Product Q&A

Q:What is the material and processing method?
A:
Made from high-grade quenched and tempered alloy steel, forged and heat treated for high strength and toughness.
Q:What certifications does the product have?
A:
The product holds ISO9001, CE, and BV certifications, and the manufacturer has coal safety certification.
Q:What is the minimum order quantity (MOQ)?
A:
The MOQ is 10 pieces per size, though some sources mention 100 pcs or 1 ton depending on specific terms.
Q:What is the lead time for delivery?
A:
Lead time is within 10 working days after receiving the deposit, or 15-20 working days for general orders.
Q:Is customization available for this master link?
A:
Yes, OEM/ODM services are available with options for customization from samples, designs, or full customization.

Send Inquiry

*To:Weifang First Rigging Co., Ltd.Weifang First Rigging Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Carbon Steel Zinc Plated and Black Coated Quick Link
Made-in-China.com