SourcingAI
Try for free
Powered by Made-in-China.com
Highway Beam Guardrail Roll Forming Machine with 21 Stations
US$45,000.00-180,000.00
1 Piece

Product profile

Customization

Available

Warranty

2 Years

Certification

CE, ISO9001

Customized

Customized

Condition

New

Control Type

PLC Control System

Automatic Grade

Automatic

Material Thickness

1.0~3.0mm

Body Frame

H400

Side Wall Thickness

T30mm

Hydraulic Motor

7.5kw

Main Motor

18.5kw

Roller Material

Gcr15&Cr12

Station

21 Stations

Transport Package

Naked and Covered by Plastic Film Into Container

Trademark

BMS

Origin

China (Mainland)

HS Code

8455221000

Key features

21-Station Forming Process: Features 19-step forming with 21 stations for precise highway beam guardrail production.
Patented Post-Cutting Device: Universal hydraulic post-cutting system eliminates die changes for different sizes.
Robust Material Construction: H450 steel frame, Cr12 steel rollers, and 8.8 grade bolts ensure long-term durability.
Comprehensive Warranty Coverage: 24-month warranty includes free replacement parts for all mechanical defects.
Global Export Experience: Exported to over 80 countries including USA, UK, Australia, and Brazil since 2006.
High-Speed Production: Real forming speed reaches 12-16m/min with frequency speed control.
Advanced Hydraulic System: 37KW hydraulic motor with 0-16Mpa pressure range for pre-punching and cutting.

Company profile

Xiamen BMS Group
High Repeat Buyers ChoiceFast DeliveryCustomization from Designs
Xiamen BMS GroupFujian, China
Business Type: Manufacturer/FactoryExport Year: 2006-05-30Nearest Port: Xiamen portAverage Response Time: ≤9.83hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address3f, Building 2, Haoli Building, No. 151 Yuehua Road, Huli District, Xiamen, Fujian, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsCZ Purlin Machine, Floor Deck Roll Forming Machine, Roller Shutter Door Machine, Stud and Track Machine, Strut Channel Roll Forming Machine, Highway Guardrail Roll Forming Machine, Standing Seam Roof Panel Roll Forming Machine, Cable Tray Roll Forming Machine, Roof Panel Roll Forming Machine, C Purlin Machine

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
The warranty is 24 months after the client receives the machine. Within this period, replacement parts are couriered free of charge.
Q:What is the delivery time?
A:
The delivery time is about 45 workdays. During off-peak seasons, it can be completed within 15 workdays.
Q:What is the minimum order quantity?
A:
The minimum order quantity (MOQ) is 1 set.
Q:What payment methods are accepted?
A:
We accept payment by T/T or by L/C.
Q:Do you provide installation and training services?
A:
Yes, we can send technicians to install and train workers at the client's factory, but this service incurs extra costs.

Send Inquiry

*To:Xiamen BMS GroupXiamen BMS Group
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

W-Beam Highway Guardrail Cold Roll Forming Machine
Made-in-China.com
2/3 Wave Highway Guardrail Cold Roll Forming Machine
Made-in-China.com
W Beam Two Waves Highway Beam Guardrail Roll Forming Machine
Made-in-China.com