SourcingAI
Try for free
Powered by Made-in-China.com
Premium Ggd Type Fixed LV Switchgear Cabinet for Reliable Power Distribution
US$100.00-3,000.00
5 Pieces

Product specifications

Model specifications

Product profile

Customization

Available

Type

Low Voltage Power Distribution Cabinet / Mcc Panel

Structure

Modular & Withdrawable / Fixed Type

Model NO.

Customizable Translation

Certification

ISO9001:2000, CCC, CE, IEC 61439

Form

Fully Welded & Bolted Construction

Operation Voltage

Low Voltage (AC 400V/690V)

Size

Customizable / Standard Sizes Available

Application Range

Residential, Commercial, Industrial, Power Plant

Shell Material

Stainless Steel / Galvanized Steel / Cold Rolled S

Shell Protection Grade

IP54 / IP65 / IP66 Weatherproof

Brand

Rui Lin

Category

Low-Voltage Complete Switchgear / Power Distributi

Protection Design

Misoperation Prevention Interlock, Door Lock Prote

Core Function

Low-Voltage Power Distribution, Power Control, Ove

Operating Environment

Indoor / Outdoor, -25℃ to +55℃

Control Function

Manual / Remote Control, PLC Compatible

Transport Package

Standard Export Packing: Cartons, Wooden Cases or

Specification

Customizable Busbar Rating / Multi-Circuit Options

Trademark

OEM/ODM Supported

Origin

China

Key features

Customizable Dimensions: Size and circuit quantity can be customized to fit specific project requirements.
IP65 Weatherproof Rating: Offers superior protection against dust and water jets for harsh outdoor environments.
Modular & Withdrawable Design: Enables easy installation, maintenance, and future expansion of the electrical system.
OEM and ODM Support: Provides full customization including logo printing, color coating, and internal layout.
High-Purity Copper Busbars: Ensures low loss, high safety, and reliable operation for industrial power projects.
Multiple Material Options: Available in Stainless Steel 304/316L, Galvanized Steel, and Cold Rolled Steel.
Wide Voltage Compatibility: Supports AC 220V to 690V with dual frequency 50Hz/60Hz for global applications.
Strict Quality Certification: Meets CE, ISO 9001, IEC 61439, and CCC standards with rigorous testing.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2026-03-08Nearest Port: Shenzhen, Tianjin, ShanghaiAverage Response Time: ≤0.01hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

About Our Factory & Business Background

AddressNo. 10, 1st Floor, Building 2, No. 10 Liujiang Street, Bajiaojing Subdistrict, Deyang, Sichuan, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsElectric Distribution Box, Switchgear, Electrical Panel Box, Distribution Box, Electrical Box, Custom Box, Globe Valve, Butterfly Valve, Gate Valve, Ball Valve

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a manufacturer?
A:
Yes, we are a professional manufacturer. We have our workshops, advanced equipment, and a skilled team. We support OEM and ODM, offering photos, videos, and certificates.
Q:What is your mode of transportation?
A:
We select transport mode (sea, air, land) based on cargo or your needs.
Q:How to get an accurate quotation?
A:
Detailed drawings (CAD/PDF/DWG/IGS/STEP/JPG files) Material requirements (steel, stainless, iron, aluminum) Surface treatment (plating, coating, anodizing) Quantity and delivery time Special requirements: packaging, labeling, shipping, etc..
Q:How do you guarantee the quality?
A:
We rigorously screen suppliers and precisely inspect all incoming materials at the source. Our production process includes full-process quality control with first article, in-process, and final inspections, utilizing high-precision 2D measuring instruments for dimensional accuracy.
Q:What is the lead time for delivery?
A:
Peak Season Lead Time: one month. Off Season Lead Time: within 15 workdays.

Send Inquiry

*To:Sichuan Chengfeng Ruilin Technology Co., Ltd.Sichuan Chengfeng Ruilin Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like